Similar Projects
Purdue University Veterinary Medicine Teaching Hospitals-Mechanical
Post-Bid
Lafayette, IN 47907

Warren Village HVAC Improvements
Post-Bid
Terre Haute, IN 47804

IN145 Service Building AHU-3 Controls
Results
Indianapolis, IN 46202

Bl580 IIDC-Chiller Replacement
Results
Bloomington, IN 47408

Jordan Hall HVAC 14 Upgrade
Post-Bid
Bloomington, IN 47408

Phase 2 - Mini Splits HVAC Equipment Replacement at Meadow Wood Apartments
Results
$120,000 to $130,000 est. value
Charlestown, IN 47111

Building Automation and Temperature Control
Post-Bid
Less than $150,000 est. value
Richmond, IN 47374

North Ventilation System Replacement
Results
Less than $150,000 est. value
Edinburgh, IN 46124

Preventative Maintenance for HVAC and Temperature Controls
Term Contract
Post-Bid
Less than $150,000 est. value
Indianapolis, IN 46204

IN076 ICTC-HVAC-Mechanical Repairs
Results
Bloomington, IN 47408

CWD Chiller Replacement
Post-Bid
Terre Haute, IN 47802

Camp Atterbury Multi Building HVAC M and R
Results
Less than $150,000 est. value
Edinburgh, IN 47223

LOI- Seeking Qualified Contractors for Various Services
Term Contract
Post-Bid
Marion, IN 46953

Chiller Plant Cooling Towers Renovation - 2020
Results
Fort Wayne, IN 46835

Cooling Tower Replacement with ACCUs
Post-Bid
$150,000 est. value
Indianapolis, IN 46219

Reported 10/21/2020 12:00 AM
Project Title

Hazelwood HVAC System Replacement

Physical Address View project details and contacts
City, State (County) Louisville, KY   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $48,000
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

The Hazelwood Center is an extended intermediate care facility. The purpose of the project is to remedy existing heating, cooling, humidity, and air quality issues in the building. The scope of the project includes replacing existing steam boilers remotely located in an adjacent building with hot water boilers located in a new mechanical room in the basement. Existing domestic water heat exchangers, DX cooling and steam heating units serving the building, Steam PTAC units, and kitchen cooking equipment fed from steam will be removed and replaced. This project is separated into four phases to allow for continuous operation of the facility. Scope of work for the TAB (Testing Adjusting and Balancing) Agency consists of furnishing all required materials, tools, instruments, coordination, participation and labor to perform and complete the TAB services per the Project plans and specifications for the above referenced Building Project. The HVAC systems for the building consists of Chilled water loop with chiller and pumps, Hot water loop with boiler and pumps, (3) Packaged roof mounted dedicated outdoor air systems. (1) Packed air handling unit. (1) Modular air handling unit utilizing hot and chilled water. (4) Modular outdoor air handling units utilizing hot and chilled water. (6) Domestic water heaters. (15) Roof mounted exhaust fans, Fan coil units serving client spaces. Controls consists of individual unitary controls on each unit and interfaced with a BAS system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents