Similar Projects
Construct a Railroad Sidetrack - 2022 Bond - City of Stevens Point
Infrastructure
Conception
$4,100,000 CJ est. value
Stevens Point, WI 54481

Badger Avenue Extension - 2022 Bond - City of Stevens Point
Infrastructure
Conception
$1,800,000 CJ est. value
Stevens Point, WI 54482

Stevens Point - Rosholt; North CTH J to STH 49
Infrastructure
Bidding
$4,000,000 CJ est. value
Stevens Point, WI 54481

Stevens Point - Rosholt; North CTH J to STH 49
Infrastructure
Bidding
$4,000,000 CJ est. value
Stevens Point, WI 54481

Snow Plowing Service
Term Contract
Post-Bid
Stevens Point, WI

Street Sweeping Service
Term Contract
Post-Bid
Stevens Point, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Pavement Milling and Reclaiming
Results
Stevens Point, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Joerns Drive Business Incubator
New Construction, Infrastructure - 23,760 SF
Pending Verification
$2,600,000 CJ est. value
Stevens Point, WI 54481

CORTA Stevens Point US-10 Retail Expansion
Addition, Demolition, Infrastructure - 9,629 SF
Pending Verification
$2,500,000 CJ est. value
Stevens Point, WI 54482

Reconstruct Minnesota Avenue - 2022 Bond - City of Stevens Point
Infrastructure
Conception
$1,900,000 CJ est. value
Stevens Point, WI 54481

Pavement Milling and Reclaiming
Infrastructure
Post-Bid
WI

Plainfield - Stevens Point, Structures
Infrastructure
Results
WI

Last Updated 12/19/2022 08:34 AM
Project Title

Washington Street - Pavement Replacement CTH U - 90th Street South Project

Physical Address View project details and contacts
City, State (County) Grant, WI 54467   (Portage County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction complete as of July 2022 , Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $181,026 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project was awarded to American Asphalt of WI in the amount of $181,026.19. The project limits are from CTH U to 90th Street South, approximately 0.8 miles in length. The work for which bids are asked includes the following: removals, excavation common, base aggregate, disintegrated granite base aggregate, pulverize and relay, asphaltic surface, reinforced concrete culvert pipe and apron endwalls, seed and fertilizer, traffic control, construction staking and all incidental items necessary to complete the work as shown on the plans and included in the contract. Work on said project shall be complete by July 15, 2022. The road will be closed to through traffic during construction. "The bidder's attention is called to the fact that this project is NOT subject to prevailing wage rates determination by the State of Wisconsin." OWNER reserves the right to reject any or all bids, waive any informality in bidding, and accept the lowest responsible bidder which serves the best interest of the Town. Questions regarding this project should be directed to the Designer: Jim Wendels @ Phone: (715) 323- 0321 or by e-mail: jim.wendels@questl lc.biz

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents