Similar Projects
Elevator Rehabilitation and Maintenance and Service for (14) Elevators (EV & EL Package) at Dyckman
Renovation
Sub-Bidding
$250,000 CJ est. value
New York, NY 10007

IDIQ Contract Citywide Elevator Upgrade
Alteration
Post-Bid
New York, NY 10065

IDIQ Contract Citywide Elevator Upgrade (Hoist Motor Generators)
Term Contract
Post-Bid
Bronx, Brooklyn, New York, NY 10065

Twelve Escalators Replacement
Alteration
Results
$10,000,000 est. value
Bronx, Brooklyn, Manhattan, NY

Rehabilitation Elevators 3 Thru 6
Renovation
Results
$2,500,000 to $5,000,000 est. value
New York, NY

Elevator Maintenence and Service - 199 Chambers Street
Term Contract
Post-Bid
NY

Elevator and Wheelchair Lift Maintenance
Term Contract
Results
Ellis Island, NJ - New York, NY 10004

Elevator Rehabilitation, Maintenance and Service
Term Contract, Alteration
Post-Bid
New York, NY

Perform Inspections, Testing, Maintenance, Rehabilitation and Repairs of the Tower Elevator Systems
Term Contract
Results
New York, NY

Elevator Parts
Term Contract
Post-Bid
New York, NY

Maintenance and Repair of Elevators Citywide
Renovation
Results
$2,685,331 CJ est. value
New York, NY 10007

Smd Services Requirements Contract for Replacement of Elevator Doors, Bucks and Related Work Within the Five Boroughs of New York City
Term Contract
Post-Bid
$150,000 CJ est. value
New York, NY 10007

Elevator Rehabilitation and Maintenance and Services for Fourteen (14) Elevators at Adams houses
Renovation, Alteration
Post-Bid
New York, NY

Elevator Rehabilitation for Fourteen (14) Elevators at Adams Houses - EL Package
Alteration
Post-Bid
$500,000 est. value
New York, NY

Hydraulic Passenger Elevators Maintenance Services
Alteration
Post-Bid
New York, NY 10022

Last Updated 09/27/2022 10:12 AM
Project Title

Elevator Replacements at Various Locations and Escalator Replacements at Sutphin Blvd-Archer Avenue-JFK Airport and West 4th Street Stations

Physical Address View project details and contacts
City, State (County) New York, NY 10024   (New York County)
Category(s) Single Trades
Sub-Category(s) Conveying Systems
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

*Due to the sensitive nature of the project, reference documents will not be posted. Please obtain documents through the means listed in the invitation to bid.*" The Metropolitan Transportation Authority, acting by and through MTA Construction and Development Company ("MTA C&D"), seeks to engage a consultant organization (the "Consultant") to provide Project Management, Construction Management, and Design Compliance Services (collectively, "PMC Services") to assist MTA C&D in administering, managing, overseeing, and coordinating the replacement of 19 elevators at 11 subway stations ("Package A") and the replacement of six escalators at two subway stations ("Package B") in the Boroughs of Manhattan and Queens. The Technical Scope of Services for this Contract is to provide PMC Services to support MTA in managing and coordinating this PMC Project and coordinating the work with other Projects. The PMC Consultant services shall be performed under the general direction of the MTA C&D Project Chief Executive Officer. Both Package No. A and No. B will be awarded as a single Contract. Replacement of 19 Elevators at Eleven 11 Subway Stations - E-34052 (Times Square - 42nd Street, 14th Street - Union Square, 8th Avenue/Canarsie Line, 14th Street - Union Square/Canarsie Line, 175th Street, 125th Street - St. Nicholas Avenue, West 4th Street, Roosevelt Avenue, Lexington Avenue/53rd Street, 14th Street - Union Square/Lexington Line, 74th Street - Broadway). The total duration of the Design-Build Contract for Package A is 48 months with 42 months of construction and six months of closeout. Replacement of Six (6) Escalators at Two (2) Subway Stations - E-30645 (West 4th Street/8the Avenue Line, Sutphin Boulevard/Archer Avenue Line). The total duration of Design-Build Contract for Package B is 38 months with six (6) months of Pre-Award, 32 months of construction and six months of closeout. List of attendees should be emailed to the Contracting Officer by Wednesday, September 7, 2022. Service-Disabled Veteran-Owned Set Aside: No Disadvantaged Owned Sub-Contracting Goal: 22.5% Contract term: 48 Months Est $ Value: $10M - $50M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 14 - Conveying Equipment, Operation and Maintenance of Conveying Equipment, Common Work Results for Conveying Equipment, Commissioning of Conveying Equipment, Elevators, Escalators and Moving Walks, Escalators.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents