Last Updated | 09/27/2022 10:12 AM |
Project Title | Elevator Replacements at Various Locations and Escalator Replacements at Sutphin Blvd-Archer Avenue-JFK Airport and West 4th Street Stations |
Physical Address | View project details and contacts |
City, State (County) | New York, NY 10024 (New York County) |
Category(s) | Single Trades |
Sub-Category(s) | Conveying Systems |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $50,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | *Due to the sensitive nature of the project, reference documents will not be posted. Please obtain documents through the means listed in the invitation to bid.*" The Metropolitan Transportation Authority, acting by and through MTA Construction and Development Company ("MTA C&D"), seeks to engage a consultant organization (the "Consultant") to provide Project Management, Construction Management, and Design Compliance Services (collectively, "PMC Services") to assist MTA C&D in administering, managing, overseeing, and coordinating the replacement of 19 elevators at 11 subway stations ("Package A") and the replacement of six escalators at two subway stations ("Package B") in the Boroughs of Manhattan and Queens. The Technical Scope of Services for this Contract is to provide PMC Services to support MTA in managing and coordinating this PMC Project and coordinating the work with other Projects. The PMC Consultant services shall be performed under the general direction of the MTA C&D Project Chief Executive Officer. Both Package No. A and No. B will be awarded as a single Contract. Replacement of 19 Elevators at Eleven 11 Subway Stations - E-34052 (Times Square - 42nd Street, 14th Street - Union Square, 8th Avenue/Canarsie Line, 14th Street - Union Square/Canarsie Line, 175th Street, 125th Street - St. Nicholas Avenue, West 4th Street, Roosevelt Avenue, Lexington Avenue/53rd Street, 14th Street - Union Square/Lexington Line, 74th Street - Broadway). The total duration of the Design-Build Contract for Package A is 48 months with 42 months of construction and six months of closeout. Replacement of Six (6) Escalators at Two (2) Subway Stations - E-30645 (West 4th Street/8the Avenue Line, Sutphin Boulevard/Archer Avenue Line). The total duration of Design-Build Contract for Package B is 38 months with six (6) months of Pre-Award, 32 months of construction and six months of closeout. List of attendees should be emailed to the Contracting Officer by Wednesday, September 7, 2022. Service-Disabled Veteran-Owned Set Aside: No Disadvantaged Owned Sub-Contracting Goal: 22.5% Contract term: 48 Months Est $ Value: $10M - $50M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |