Similar Projects
First Avenue - River To Grant - SR11 - City Of Tucson
Infrastructure
Conception
$71,988,200 CJ est. value
Tucson, AZ 85719

Houghton Road - 22nd Street To Irvington - SR1J - City Of Tucson
Infrastructure
Conception
$40,721,000 CJ est. value
Tucson, AZ 85747

AutoZone #3618 / Tucson (Ajo)
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Tucson, AZ 85757

Valencia - Kolb To Houghton - SR14 - City Of Tucson
Infrastructure
Design
$22,388,700 CJ est. value
Tucson, AZ 85746

Martha Cooper Library Expansion
Addition, Demolition, Renovation, Infrastructure - 13,700 SF
Bidding
$6,100,000 CJ est. value
Tucson, AZ 85712

Pascua Yaqui Tribe (PYT) Early Learning Center
New Construction, Infrastructure
Bidding
$9,000,000 CJ est. value
Tucson, AZ 85757

Tangerine Road Corridor Project Interstate 10 to Dove Mountain Boulevard/Twin Peaks Road - Phase 2 - Town of Marana
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Marana, AZ 85658

Ameri-Park / Marana - Revised
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Marana, AZ 85653

Tucson - Benson Highway (I-10) (Ajo Way to MP 272)
Infrastructure
Results
$15,495,176 CJ est. value
Tucson, AZ 85706

Loma Linda Pumphouse Roof and Water Tank Replacement
Renovation, Term Contract
Results
$100,000 to $200,000 est. value
Mount Lemmon, AZ 85619

TOKA 12 Lot Subdivision - San Xavier District
New Construction
Construction
$1,271,309 est. value
Tucson, AZ 85746

Lohse Family YMCA Phase 2 - TI Package
Infrastructure, Renovation
Construction
$2,500,000 CJ est. value
Tucson, AZ 85701

22nd Street Manufacturing and Warehouse Building
New Construction, Infrastructure - 16,100 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85713

South Kolb Road Self-Storage
New Construction, Infrastructure - 14,511 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85756

La Paloma Reclaimed Reservoir Rehabilitation - W310 - City of Tucson
Infrastructure
Conception
$2,289,700 CJ est. value
Tucson, AZ 85701

Last Updated 10/06/2022 12:33 PM
Project Title

Supply Well and Testing Metro Southwest Diablo Village Water System

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85705   (Pima County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be accomplished under the following specifications consists of the drilling, construction, and testing of two supply wells for the Metro Southwest Diablo Village water system in Southwestern Tucson, Arizona. The site is located on Ajo Way south of the Ryan Airfield (Figure 1 of the included Technical Specifications). The proposed drilling locations for supply wells designated as DV-3 and DV-4 are shown on Figure 2 of the included Technical Specifications. The cadastral locations for each well are listed below: DV-03 (15-12)18 BBB DV-04 (15-12)18 CBC The actual drilling sites will be staked by the OWNER prior to mobilization of the drill rig. The anticipated geology of the site is loosely to moderately consolidated basin fill sediments consisting of sands, gravels, silts, and clays. Lithologic logs for nearby exploration borehole Wildflower WP-1 Exploration Borehole are provided in Appendix A of the included Technical Specification. All work is to be completed in 120 calendar days from the date of Notice to Proceed pursuant to the Construction Documents and Technical Specifications prepared by Clear Creek Associates. Liquidated damages for late delivery will be assessed per the Pima Association of Governments Standard Specifications for Public Improvements, 2015 Edition with Amendments. BID BOND: Bids must be accompanied by an original bid guarantee of ten percent (10%) of the TOTAL BID amount. OWNER accepts the forms of bid guarantee provided in A.R.S. 34-201(A) (3). LICENSING: All bidders must hold a valid license issued by the State of Arizona Registrar of Contractors and maintain same throughout the duration of the contract term. Failure to maintain said license may be grounds for default of the contract and subsequent termination. Karah Wiseman; Project Coordinator at Smyth Industries IN WRITING TO: E-mail: kwiseman@smythindustries.com

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents