Similar Projects
Oslo Levee Repair
Design
$25,000 to $10,000 est. value
Oslo, MN

In Redwood County on TH 19 (W Bridge St) From 200 Ft East of N Grove St to 120 Ft West of S Minnesota St Approach Panels, ADA Improvements, Pipe Lining, and Bridge No. 5133
New Construction, Infrastructure
Bidding
MN

Shiebers Addition Erosion Repair
Infrastructure
Bidding
$80,000 est. value
Plymouth, MN

NLH Pond Kettle Repair
Post-Bid
New London, MN 56273

Directional Boring
New Construction
Post-Bid
Minneapolis, MN 55401

2020 Northeast Drainage Area Improvements
Results
$1,500,000 est. value
Lino Lakes, MN 55104

2020 Pond Cleaning
Renovation
Results
$110,000 est. value
West Saint Paul, MN 55118

Renville and Sibley County Judicial Ditch No.15 Branch P1
Infrastructure
Bidding
$2,500,000 est. value

DNR1 Eckvoll WMA Culvert Installation
Post-Bid
Gatzke, MN 56724

CSAH 34 Reconstruction
Results
Fergus Falls, MN 56537

Coon Creek Park Stream Restoration
Infrastructure
Bidding
$984,978 est. value
Andover, MN 55304

Replacement of all Culverts, Full-Depth Reclamation, and Paving
Post-Bid
Baudette, MN

Culvert Replacement with Culvert, Minor Approach Grading and Aggregate Surfacing
Results
$120,189 est. value
MN

Judicial Ditch 15 Improvements Branch A
Infrastructure
Bidding
MN

CWF Lake Irving Protection
Post-Bid
$400,000 est. value
Bemidji, MN 56601

Last Updated 08/25/2021 11:47 AM
Project Title

Le Sueur County Ditch No. 43

Physical Address View project details and contacts
City, State (County) Montgomery, MN   (Le Sueur County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $305,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the following major quantities of Work: A. Approximately 8,300 linear feet of open ditch cleaning in- cluding some hauling of spoils, ditch widening and sideslope repairs in some areas. The work also includes heavy vegetative clearing, repair and armoring of existing tile outlets, removal and replacement of existing concrete weir and three CMP culverts and seeding and erosion control of all disturbed areas

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents