Similar Projects
Site 45-M-SE-2 Middle School
New Construction
Conception
$46,700,000 est. value
Orlando, FL 32827

Legends Academy K-8 School
New Construction, Renovation - 22,190 SF
Conception
Orlando, FL

Site 73-T-W-7 School Replacement
New Construction - 150,289 SF
Design
$38,800,000 est. value
Ocoee, FL 34761

Construction Management at Risk - Lakemont Elementary School and Windy Ridge K8 Multi-System Capital Renewal Project
Renovation
Bidding
$7,140,000 est. value
Orlando, Winter Park, FL 32792

Pinar Elementary School Comprehensive/Replacement Project Stormwater Revisions
New Construction, Renovation - 85,201 SF
Post-Bid
Less than $12,700,000 est. value
Orlando, FL 32800

Ocps-Sy2020-21 16-Site Portable Project
Renovation, Term Contract
Post-Bid
Orlando, FL

Site 30-E-SE-3 Elementary
New Construction
Results
$27,200,000 est. value
Orlando, FL 32801

Construction Management at Risk for Three Points Elementary School Comprehensive Renovation Project
Renovation
Results
Less than $15,500,000 est. value
Orlando, FL 32822

Islamic Center of Orlando
New Construction, Addition - 26,000 SF
Construction
$3,947,330 est. value
Orlando, FL

Riverdale Elementary School and Lakeville Elementary School Capital Renewal Projects
Construction
Orlando, FL 32817

Construction Management at Risk Services for Site 47-E-W-4 and Site 97-E-SE-2 Elementary School Relief Project
Renovation
Post-Bid
$45,000,000 est. value
Orlando, FL

Construction Management at Risk Services for the Four Site SY 2024-25 Elementary School Functional Equity Classroom Additions Project
Addition
Results
$17,000,000 to $19,000,000 est. value
FL

Site 90-K8-N-7 K8 School
New Construction - 164,000 SF
Construction
Less than $49,000,000 est. value
Apopka, FL 32712

Castle Creek Elementary School
Renovation
Post-Bid
Orlando, FL 32828

Tildenville Elementary School Multi-System Capital Renewal Project
Renovation
Results
$4,693,000 est. value
Winter Garden, FL 34787

Last Updated 06/06/2022 03:55 PM
Project Title

Construction Management at Risk Services for the Five Site SY 2023-24 Multi-System Group 1 Capital Renewal Project

Physical Address View project details and contacts
City, State (County) FL   (Orange County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $14,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace modified bitumen roofing systems, repair/replace existing lightning protection systems, replace fire alarm/intercom/intrusion detection systems, renovate campus HVAC systems, replace BAS systems, paint exterior doors and frames, and replace gutters and downspouts. Major elements of the project include: A Multi-System Capital Renewal project for five sites: Columbia ES located at 650 E River Falcons Way Orlando Florida 32833, Moss Park ES located at 9301 N Shore Golf Club Blvd Orlando Florida 32832, Stone Lakes ES located at 15200 Stoneybrook Blvd Orlando Florida 32828, Vista Lakes ES located at 6050 Lake Champlain Dr. Orlando Florida 32829, and West Creek ES located at 5275 S Orange BlossomTrail Orlando Florida 32837. 1. Replace Modified Bitumen Roofing System (all sites except West Creek ES) 2. Repair/Replace existing Lightning Protection system (all sites) 3. Replace Fire Alarm System / Intercom Systems/Intrusion Detection System (all sites except Stone Lakes ES and West Creek ES) 4. Renovation of the campus building heating, ventilation and air conditioning system (all sites except Columbia ES) 5. Replace BAS System and existing exterior pole mounted luminaires with LED (Columbia ES only) 6. Paint exterior doors and frames and clean and seal brick veneer (Stone Lakes ES only) 7. Replace Gutters and Downspouts (West Creek ES only) Each campus will remain occupied during design and construction.

Details

Elementary School, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents