Similar Projects
Chair City Church Parking Expansion
Conception
Gardner, MA 01440

Interchange Improvements, Interstate 495 (NB and SB)at Interstate 90 (EB and WB)
New Construction, Infrastructure
Bidding
$339,185,106 est. value
Westborough, MA 01581

Interchange Improvements, Interstate 495 (NB and SB)at Interstate 90 (EB and WB)
New Construction, Infrastructure
Bidding
$339,185,106 est. value
Westborough, MA 01581

Crack Sealing
Term Contract
Post-Bid
Less than $105,000 est. value
Templeton, MA 01438

Roadwork
Post-Bid
Southborough, MA

Old South St. Bridge Repairs, Westville Lake, Sturbridge, MA
Results
$100,000 to $250,000 est. value
Sturbridge, MA

Bridge Rehabilitation - Elm Street Over Quick Stream Overflow
Results
$400,000 est. value
Blackstone, MA 01504

Scheduled and Emergency Bridge Repairs at Various Locations on Interstate 90
New Construction, Infrastructure
Bidding
$2,112,515 est. value

Miscellaneous Bituminous Type I Repairs - Handwork
Post-Bid
$9,500 est. value
Shrewsbury, MA

Scheduled and Emergency Bridge Deck and Joint Repairs at Various Locations
Results
Less than $1,515,000 est. value

Structural Repairs and Related Work (Including Painting) On 4 Bridges Along Interstate 90
New Construction, Infrastructure
Bidding
$5,142,006 est. value
Brimfield, Warren, West Springfield, Westfield, MA

Town Center Improvements Project
Post-Bid
$900,000 est. value
West Brookfield, MA

Bridge Replacement BR No (Steel) Fruit Street Over CSX Railroad and the Sudbury River
Results
Less than $12,580,805 est. value
Hopkinton, Westborough, MA 01748

Shrewsbury Tower, Phase 2 Pavement Improvements
Infrastructure
Bidding
$60,000 est. value
Shrewsbury, MA 01545

Paving Roads in Hubbardston
Post-Bid
$352,000 est. value
Hubbardston, MA

Last Updated 02/02/2022 05:12 AM
Project Title

Resurfacing and Related Work (Including Bridge Decks and Ramps) Along A Section of Route 2

Physical Address View project details and contacts
City, State (County) Fitchburg, Westminster, MA   (Worcester County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,354,103
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule Of Operations - Fixed Price $70,500.00","100." "12.000","a","Clearing And Grubbing","101." "10.000","Ea","Tree Removed - Diameter Under 24 Inches","103." "10.000","Ea","Tree Removed - Diameter 24 Inches And Over","104." "10.000","Ea","Stump Removed","105." "320.000","Cy","Unclassified Excavation","120.1" "75.000","Cy","Reinforced Concrete Excavation","127.1" "235.000","Sy","Reinforced Concrete Deck Excavation (Full Depth)","127.4" "30.000","Cy","Reinforced Concrete Deck Excavation (Partial Depth)","127.41" "1056.000","Sy","Bridge Pavement Excavation","129.6" "585.000","Cy","Class a Trench Excavation","141." "600.000","Cy","Class b Trench Excavation","142." "30.000","Cy","Class b Rock Excavation","144." "627.000","Cy","Gravel Borrow - Type c","151.01" "54.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "244.000","Ea","Drainage Structure Adjusted","220." "336.000","Ft","Drainage Structure Rebuilt","220.2" "5.000","Ea","Drainage Structure Remodeled","220.5" "10.000","Ea","Frame And Cover","221." "10.000","Ea","Frame And Cover - Secured","221.1" "187.000","Ea","Frame And Grate - Massdot Bar Type","222." "7.000","Ea","Frame And Grate - Massdot Drop Inlet","222.2" "214.000","Ea","Frame And Grate (Or Cover) Removed And Discarded","223.2" "1000.000","Sy","Cleaning Paved Waterways","226.5" "553.000","Cy","Removal Of Drainage Structure Sediment","227.3" "35745.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "560.000","Ft","12 Inch Reinforced Concrete Pipe","241.12" "80.000","Ft","15 Inch Reinforced Concrete Pipe","241.15" "120.000","Ft","18 Inch Reinforced Concrete Pipe","241.18" "80.000","Ft","24 Inch Reinforced Concrete Pipe","241.24" "40.000","Ft","30 Inch Reinforced Concrete Pipe","241.30" "240.000","Ft","36 Inch Reinforced Concrete Pipe","241.36" "80.000","Ft","42 Inch Reinforced Concrete Pipe","241.42" "12.000","Ea","12 Inch Reinforced Concrete Pipe Flared End","242.12" "1.000","Ea","15 Inch Reinforced Concrete Pipe Flared End","242.15" "2.000","Ea","18 Inch Reinforced Concrete Pipe Flared End","242.18" "1.000","Ea","24 Inch Reinforced Concrete Pipe Flared End","242.24" "1.000","Ea","30 Inch Reinforced Concrete Pipe Flared End","242.30" "4.000","Ea","36 Inch Reinforced Concrete Pipe Flared End","242.36" "746.000","Sy","Stone For Pipe Ends","258." "560.000","Ft","12 Inch Pipe Removed And Discarded","272.12" "80.000","Ft","15 Inch Pipe Removed And Discarded","272.15" "120.000","Ft","18 Inch Pipe Removed And Discarded","272.18" "80.000","Ft","24 Inch Pipe Removed And Discarded","272.24" "40.000","Ft","30 Inch Pipe Removed And Discarded","272.30" "240.000","Ft","36 Inch Pipe Removed And Discarded","272.36" "80.000","Ft","42 Inch Pipe Removed And Discarded","272.42" "12.000","Ea","12 Inch Flared End Removed And Discarded","273.12" "1.000","Ea","15 Inch Flared End Removed And Discarded","273.15" "2.000","Ea","18 Inch Flared End Removed And Discarded","273.18" "1.000","Ea","24 Inch Flared End Removed And Discarded","273.24" "1.000","Ea","30 Inch Flared End Removed And Discarded","273.30" "4.000","Ea","36 Inch Flared End Removed And Discarded","273.36" "100.000","Sy","Hot Mix Asphalt Waterway","280." "100.000","Sy","Cement Concrete Paving (Waterway)","281." "278809.000","Sy","Pavement Fine Milling","415.2" "191.000","Ton","Hma For Patching","451." "20337.000","Gal","Asphalt Emulsion For Tack Coat","452." "44808.000","Ft","Hma Joint Sealant","453." "31113.000","Ton","Superpave High Rap Surface Course - 12.5 - Polymer (Ssc - Hr - 12.5 - p)","454.231" "290.000","Ton","Superpave Waterproofing Surface Course - 12.5 (Ssc-w-12.5)","457.2" "608.000","Ton","Hot Mix Asphalt Berm","470." "500.000","Ton","Temporary Asphalt Patching","472." "97922.000","Ft","Milled Rumble Strip (Type a)","477." "388.000","Ft","Sawing & Sealing Joints In Asphalt Pavement At Bridges","482.31" "106.000","Ft","Granite Curb Type Va4 - Straight","504." "208.000","Ea","Granite Curb Type Va4 - Splayed End","504.2" "36.000","Ft","Granite Transition Curb For Pedestrian Curb Ramps - Straight","509." "216.000","Ft","Granite Edging Type Sb - Straight","511.1" "55.000","Ea","Granite Curb Inlet - Straight","514." "394.000","Ft","Curb Removed And Reset","580." "55.000","Ea","Curb Inlet Removed And Reset","581." "4109.000","Ft","Edging Removed And Reset","583." "44.000","Ft","Curb Removed And Discarded","594." "55.000","Ea","Curb Inlet Removed And Discarded","595." "1048.000","Ft","Edging Removed And Discarded","597." "4500.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "2000.000","Ft","Guardrail, Tl-3 (Double Faced)","621.13" "4.000","Ea","Trailing Anchorage","627.1" "4.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "2.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "2.000","Ea","Transition To Rigid Barrier (Double Faced)","628.23" "4.000","Ea","Transition To Bridge Rail","628.24" "7000.000","Ft","Highway Guard Removed And Discarded","630.2" "34.000","Sy","Cement Concrete Sidewalk","701." "20.000","Sy","Cement Concrete Pedestrian Curb Ramp","701.2" "15.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "3.000","Ea","Emergency Response","748.1" "2046.000","Cy","Loam Borrow","751." "1.000","Ls","Npdes Stormwater Pollution Prevention Plan","756." "15339.000","Sy","Seeding","765." "10817.000","Ft","Sediment Control Barrier","767.121" "7006.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "1.000","Ea","2 Lane Classification Traffic Data Collection Station","819.906" "1.000","Ea","3 Lane Classification Traffic Data Collection Station","819.907" "729.000","Sf","Warning-Regulatory And Route Marker - Aluminum Panel (Type a)","832." "8.000","Ea","Delineation For Guard Rail Termini","833.7" "38.000","Ea","Demountable Reflectorized Reference Location Sign","834." "606.000","Ea","Reflectorized Flexible Delineator Post (Amber)","834.17" "350.000","Ea","Reflectorized Flexible Delineator Post (White)","834.18" "108.000","Ea","Demountable Reflectorized Station Marker","836.5" "61.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "18.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/2 Brkway Post Assemblies-Steel","848.1" "242.000","Day","Traffic Cones For Traffic Management","851.1" "2309.000","Sf","Safety Signing For Traffic Management","852." "484.000","Day","Truck Mounted Attenuator","853.403" "242.000","Day","Temporary Illumination For Work Zone","853.8" "273488.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "6395.000","Ft","Temporary Paving Markings - 6 Inch (Tape)","854.036" "11880.000","Sf","Pavement Marking Removal","854.1" "19234.000","Ft","Temporary Paving Markings - 12 Inch (Painted)","854.112" "484.000","Day","Temporary Portable Rumble Strip","854.6" "484.000","Day","Arrow Board","856." "660.000","Day","Portable Changeable Message Sign","856.12" "46464.000","Day","Reflectorized Drum","859." "484.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "3717.000","Sf","Pavement Arrows And Legends Reflectorized White (Thermoplastic)","864.04" "974.000","Ea","Slotted Pavement Marker Two-Way White/Red","864.33" "747.000","Ea","Slotted Pavement Marker Two-Way Yellow/Red","864.34" "68372.000","Ft","6 Inch Durable Wet Reflective Recessed White Line (Polyurea)","868.206" "5900.000","Ft","12 Inch Durable Wet Reflective Recessed White Line (Polyurea)","868.212" "15988.000","Ft","6 Inch Durable Wet Reflective Recessed White Line (Preformed)","868.306" "68372.000","Ft","6 Inch Durable Wet Reflective Recessed Yellow Line (Polyurea)","869.206" "729.000","Sf","Traffic Sign Removed And Discarded","874.8" "97.000","Ea","Sign Post Removed And Discarded","877.1" "30.000","Cy","4000 Psi, 1.5 Inch, 565 Cement Concrete","901." "200.000","Cy","Rapid Setting Low Permeability Repair Concrete","909.3" "15.000","Cf","Concrete Repair Mortar","909.41" "6507.000","Lb","Steel Reinforcement For Structures - Epoxy Coated","910.1" "60.000","Ea","Drilling And Grouting Dowels","912." "4400.000","Sf","Membrane Waterproofing For Bridge Deck Repairs","966." "4.000","Ea","Bridge Deck Drain","968.3" "220.000","Ft","Pre-Compressed Seal Bridge Joint System","973." "80.000","Ft","Metal Bridge Railing - Top Rail","975.01" "80.000","Ft","Metal Bridge Railing - Bottom Rail","975.02" "2.000","Ea","Metal Bridge Railing - Post","975.03" "1000.000","Sf","Expanded Metal Shielding","994.051" "3000.000","Sf","Temporary Protective Shielding","994.1" "6000.000","Sf","Temporary Protective Shielding Removed And Reset","994.12"

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents