Similar Projects
RSO Septic Tank Repair
Term Contract
Bidding
Russellville, AR 72801

Fourche Creek Water Reclamation Facility Fog Receiving Station and Digester Upgrades
Renovation
Bidding
Little Rock, AR 72206

Water Project
Post-Bid
Less than $166,000 est. value
Nashville, AR

Upper Riverside Interceptor Assessment, Phase II
Post-Bid
North Little Rock, AR 72117

Water Quality Demonstration
Results
Less than $1,412,520 est. value
Conway, AR 72032

HSWS Outfall Improvements
Results
$4,000,000 est. value
Heber Springs, AR

W3 Pump Replacement
Infrastructure
Bidding
Fayetteville, AR

Rose City and Military Drive Basins CIPP 2021 Rehabilitation Project
Post-Bid
$1,637,100 est. value
North Little Rock, AR 72117

Raw Water Supply Transmission Pipeline Contract 5
Results
Less than $11,200 est. value
Hot Springs, AR

Construction of Filters 13 and 14
Term Contract
Bidding
Greers Ferry, AR 72067

Sewer Line Project Rehabilitation
Post-Bid
England, AR

Highway 9 Water Line Relocation
Results
Salem, AR

Water System Improvements
Infrastructure
Bidding
Tillar, AR

Water System Improvements: Contract II - Water Line Extension and Chlorination Facility
Post-Bid
El Dorado, AR

PLWC Basins 1-3-4 Manhole Rehabilitation
Results
Less than $603,200 est. value
Paragould, AR

Reported 07/28/2021 12:00 AM
Project Title

Wastewater System Improvements - Contract Section I (Collection System)

Physical Address View project details and contacts
City, State (County) Alpena, AR   (Boone County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Sanitary Sewers, Sewage Treatment Plant, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Section I - Furnish and install approximately 20,000 lineal feet of eight-inch PVC gravity sewer mains, approximately 400 lineal feet of 10-inch PVC gravity sewer mains, 130 cast-in-place concrete manholes, one duplex-pump submersible pump station, approximately 3,200 lineal feet of six-inch PVC force main, along with four-inch PVC service line connections, fittings, and all appurtenances for a complete installation as shown on the Plans and as Specified.

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents