Similar Projects
North Star Outdoor Storage
New Construction - 217,808 SF
Conception
$500,000 est. value
Meridian, Star, ID 83669

Public Storage - Ten Mile Road / Meridian
New Construction
Conception
$3,000,000 est. value
Meridian, ID 83646

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Design
$4,181,379 CJ est. value
Boise, ID 83706

Lewiston Regional Office Facility Improvements - Phase II
New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Boise, ID 83702

Locust Grove, Victory to Overland Roadway and Roundabout
Infrastructure
Bidding
$4,165,400 CJ est. value
Meridian, ID 83642

Brandon Road Bridges
New Construction, Infrastructure
Bidding
$2,200,000 CJ est. value
Star, ID 83669

The Everest Lot 1
Addition - 58,000 SF
Post-Bid
Boise, ID 83716

Saturn Way Storage Condos
New Construction - 1,495,284 SF
Post-Bid
$10,000,000 CJ est. value
Boise, ID 83709

Bull Meadow Sage-Grouse Habitat Improvement
Infrastructure
Results
$400,000 est. value
Boise, ID

West Boise Water Renewal Facility (WBWRF) Maintenance Building - North Restroom Addition
Addition
Results
$300,000 est. value
Boise, ID 83714

Project Peregrine - FaceBook / Meta Data Center / Kuna
New Construction, Infrastructure - 960,000 SF
Construction
$800,000,000 CJ est. value
Kuna, ID 83634

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

Idaho Street Mixed-Use Building
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Boise, ID 83702

RFP Design - Design Plans for Pickles Butte Sanitary Landfill Gas Collection Project
Alteration
Conception
Boise, ID

Julia Davis River Node Memorial Construction
Infrastructure
Design
$600,000 CJ est. value
Boise, ID 83702

Last Updated 10/24/2022 03:32 PM
Project Title

Store Local- Phase 1 Areas A, B and C

Physical Address View project details and contacts
City, State (County) Boise, ID 83706   (Ada County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $5,410,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 24, 2022 a building permit has been issued, but a construction timeline has not been established.

Details

2 Stories Above Grade, 125,292 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents