Similar Projects
Regulated Underground Storage Tank Site
Infrastructure
Bidding
Columbia, SC

Kitchen Hood Repair and Replacement
Alteration
Bidding
Manning, Perry, Wateree, SC

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Coastal Center - Kitchen and Warehouse - New Fire Alarm System
Results
Less than $25,000 est. value
Summerville, SC 29485

Fire Alarm Inspection, Testing, and Maintenance
Results
Charleston, SC 29404

David Building - Fire Pump Control Panel Replacement Code Compliance
Alteration
Bidding
$125,000 to $175,000 est. value
Columbia, SC 29201

Wet Pipe Fire Sprinkler System P-2904
Renovation - 1,854 SF
Post-Bid
Moncks Corner, SC

Water System Improvements Repair and Painting Highway 9 Elevated Tank
Results
Dillon, SC 29536

Detention Services and Equipment Upgrades - Lee CI - Fire Alarm Replacement
Alteration
Bidding
$1,900,000 to $2,200,000 est. value
Bishopville, SC 29010

Williams Middle School Kitchen Waste Line Repair
Post-Bid
Florence, SC 29501

Water Storage Tank Maintenance Program
Results
Less than $89,105 est. value
Ruffin, Walterboro, SC 29488

Tanker
Post-Bid
Mullins, SC 29574

Expression of Interest to Design and Engineer Halon Fire Suppression Systems with FK-5-1-12 Clean Agent Fire Suppression Systems at the Savannah River Site- Located near Aiken, SC
Results
Aiken, SC

Indefinite Delivery Contract - Mechanical/Plumbing Services
Post-Bid
Charleston, SC 29401

Last Updated 09/14/2021 03:07 PM
Project Title

Standpipe Replacement Project

Physical Address View project details and contacts
City, State (County) Lugoff, SC 29078   (Kershaw County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Fire Protection, Plumbing, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of the demolition of the existing 1MG standpipe located on the project site. The project also includes the construction of a new elevated water storage tank, associated SCADA controls, yard piping, and appurtenances necessary to complete the project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents