Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Osterburg Scrubgrass Creek
Infrastructure, Renovation
Design
$3,399,179 CJ est. value
Osterburg, PA 16667

Osterburg Scrubgrass Creek
Infrastructure, Renovation
Design
$3,399,179 CJ est. value
Osterburg, PA 16667

SR 1036 - PA 26 to Huntingdon Co Line
Infrastructure
Bidding
$2,500,000 CJ est. value
Six Mile Run, PA 16679

SR 1036 - PA 26 to Huntingdon Co Line
Infrastructure
Bidding
$2,500,000 CJ est. value
Six Mile Run, PA 16679

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Roadway and Miscellaneous Repairs
Infrastructure
Results

PA 913 - PA 26 to Huntingdon Co Line
Infrastructure
Results
$1,000,000 to $2,499,999 est. value
PA

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

PA 56 - Rouzer Rd to SR 4030
Infrastructure
Design
$8,590,000 CJ est. value
Lincoln Township, PA 15521

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Roadway and Bridge Reconstruction
New Construction, Infrastructure
Results
$50,000,000 est. value

T-317 Mtn Road Bridge
Renovation, Infrastructure
Conception
$629,478 est. value
Manns Choice, PA

Last Updated 04/28/2023 06:02 AM
Project Title

S Alleghenies HFST and Signal Enhancements

Physical Address View project details and contacts
City, State (County) Bedford, PA 15522   (Bedford County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $3,441,194 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for the construction of High Friction Surface Treatment, Centerline Rumble Strips and Pavement Markings in Bedford, Cambria, Fulton, Huntingdon and Somerset Counties and includes Traffic Signal Upgrades at two locations on SR 0030 in Somerset County. All work included in the bid package is to be completed as indicated on the approved drawings included in the bid package for State Route 0030, Section 19s, in Bedford County, Various Townships at the locations indicated on the plans. Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS DBE: 9% Structure Work: 0.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Miscellaneous 408 Version: 2020-5 PENNDOT - S Alleghenies HFST and Signal Enhancements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SR/SEC/Group ID:30/19S/---

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents