Similar Projects
Addition and Interior Renovations at Rumson-Fair Haven Regional High School
Renovation
Construction
$3,259,000 est. value
Rumson, NJ 07760

Christian Brothers Academy Campus Improvements
Renovation, Addition
Design
$6,000,000 est. value
Lincroft, NJ 07738

Renovations and Alterations at Mahala F. Atchison School and Tinton Falls Middle School
Renovation
Construction
$2,514,000 est. value
Tinton Falls, NJ 07724

Gym and Cafeteria Renovations Wolf Hill and Maple Place Schools
Renovation
Results
$450,000 est. value
Oceanport, NJ 07757

Toilet Renovations Wolf Hill and Maple Place Schools
Renovation
Results
Oceanport, NJ 07757

Additions and Alterations at Multiple Schools Deane-Porter Elementary School and Forrestfale School
Renovation, Addition
Results
$19,471,000 est. value
Rumson, NJ 07760

Shore Regional High School Restroom Renovation
Renovation
Post-Bid
West Long Branch, NJ 07764

Disaster Recovery Services
Results

Building 56 Renovation
Renovation
Results
Highlands, NJ 07732

New Construction of Multi-Purpose Facility, Manasquan High School
New Construction
Results
$4,000,000 est. value
Manasquan, NJ 08736

Miscellaneous ADA Renovations at Manalapan-Englishtown Regional BOE Offices and Exterior Door Replacement at Manalapan-Englishtown Middle School
Renovation
Results
Englishtown, NJ 07726

Security Vestibule and Alteration at Tinton Falls Middle School
Renovation
Results
Tinton Falls, NJ 07724

Entry Addition at Raritan High School
Addition - 97 SF
Results
Hazlet, NJ 07730

District Wide Facilities ADA Improvements (Phase III)
Renovation
Post-Bid

Secure Vestibule Renovations and New Construction of Accessory Structures at Both District Schools
New Construction, Renovation
Results
$650,000 est. value
Oceanport, NJ 07757

Reported 07/15/2021 12:43 PM
Project Title

Interior Renovations at Rumson-Fair Haven Regional High School

Physical Address View project details and contacts
City, State (County) Rumson, NJ 07760   (Monmouth County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced June 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

9,000 SF Renovation. Scope of Work: Demolition, Carpentry, Roof, Doors, Toilet Partitions and Accessories, Casework, Painting, Flooring, Epoxy Floor, Ceramic Tiles, Stucco, Lockers, Plumbing, HVAC, Electrical.

Details

1 Middle/Senior High School, Approximately 9,000 SF Renovation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents