Last Updated | 09/19/2023 01:03 AM |
Project Title | Well No. 19 and 24 Rehabilitation and Upgrades |
Physical Address | View project details and contacts |
City, State (County) | Albany, GA 31701 (Dougherty County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $150,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Question Deadline 09/22/2023 at 2:30 PM ET For additional information, contact Ricky Gladney, Buyer I, at (229) 431-3211. Submit all questions via email to rqladney@albanyqa.gov cc: jswilliams@albanyqa.gov and kross@albanyqa.gov. and Replies of substance will be answered in the form of an addendum and made available to all potential bidders. for all work required to rehabilitate and upgrade Well No. 19 & 24 in accordance with bid documents, specifications, and all other contract documents. Contractor may bid on one or both of the projects, the contract, bonds, and bid title shall be amended with only one of the projects listed if a single bid is placed. location 2004 Stratford Dr, Albany, Georgia 31705 (Well No. 19) 2867 Gillionville Rd, Albany, Georgia 31721 (Well No. 24). Work of the project includes improvements to the City's Well No. 19 & 24 located at 2004 Stratford Dr, Albany, Georgia 31705 (Well No. 19) and 2867 Gillionville Rd, Albany, Georgia 31721 (Well No. 24). The Contractor will mobilize and perform a pump test to determine well capacity, static water level, and pumping water level. Contractor shall pull the pump and perform a preliminary video inspection of the well; well casing & screens are to be cleaned, post cleaning video inspection completed, and pump and motor upgrades performed to meet required duty conditions. Existing pump base will be demolished and reconstructed to meet Georgia EPD minimum standards and discharge piping, valves, fittings, etc. will be replaced to match up to new pump discharge head elevation as detailed in the plans. Electrical and control improvements will also be made as detailed in the plans. All materials shall be provided by Contractor except where noted to re-use or re-build existing items on plans. Once all improvements have been completed the Contractor will be responsible for performance testing, disinfection, sampling, and laboratory testing necessary to place the well back in service. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |