Similar Projects
Purchase of Materials for Mentor Lagoons Nature Preserve and Marina Boardwalk and Observation Deck
Term Contract
Bidding
Mentor, OH 44060

Mosquito Lake State Park - Marina Building
New Construction, Infrastructure
Bidding
$11,000,000 est. value
Cortland, OH 44410

Cincinnati Riverfront Boat Dock
Infrastructure
Post-Bid
Cincinnati, OH

East Hospital Dock Expansion
Alteration
Post-Bid
$5,475,000 est. value
Columbus, OH 43203

Port Clinton Coastal Access Plan
New Construction
Results
$5,600,000 est. value
Port Clinton, OH 43452

Mentor Lagoons Park Marina Bulkhead Replacement
Results
$500,000 est. value
Kirtland Hills, Mentor, OH 44060

Vermilion East Pier Repair
Construction
$1,000,000 to $2,000,000 est. value
Vermilion, OH

Mahoning River Canoe/Kayak Livery
Results
$140,000 est. value
Leavittsburg, OH 44430

Canfield Loading Dock
Results
Less than $380,400 est. value
Columbus, OH 43201

Winton Woods Accessible Canoe/Kayak Launch
Results
Less than $125,000 est. value
Cincinnati, OH 45231

Simonds-Heller Park Paddling Ramp
Results
$106,577 est. value
Newcomerstown, OH

Knox Lake Boating Access Improvements
Results
OH

Eldon Russell Boat Launch Improvements
Results
$228,514 est. value
Burton, OH 44021

Marina Building Loading Dock Support Project
Results
Less than $65,000 est. value
Troy, OH 45373

Dock 24 and 26 Master Modernization and Rehabilitation Project
Infrastructure
Results
$20,500,000 est. value
Cleveland, OH

Last Updated 03/17/2022 11:49 AM
Project Title

Reconstruction of Dock Face Phase 3

Physical Address View project details and contacts
City, State (County) Toledo, OH   (Lucas County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,273,725
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DOCK SURFACE: Remove existing crane rails, remove pavement to 50 feet from sheet pile wall, removal electrical manholes and conduit, furnish and install new drainage, backfill and new pavement. Pavement will also be required between tracks in the areas of the track where there are turnouts or switches. In addition, tie backs, as directed on the drawings, should be completely dug up so that they may be inspected. A portion of the existing storm system will need to be reworked including a lift station. This will require excavation, new pipe, manholes, backfill and discharge through the sheet pile wall. The electrical power for the lift station is to be coordinated with the electrical contractor. RAILROAD TRACK: The track is to be removed. The track should be graded and all track meeting AREMA Class 1 Relay shall be reused. It is assumed that 60% of the rail can be re-used on this project. Track is to be replaced, including ballast. Precast concrete crossing panels will also be installed along the straight portions of the track. The base bid for the rail would be to non-perform track removal between 0+00 and 2+50 and also 37+00 to 41+60. The alternate for this area would be to remove and replace track assuming 60% re-use of track.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents