Similar Projects
Trailside at Everett Park Phase II
New Construction, Infrastructure
Conception
$3,800,000 CJ est. value
South Haven, MI 49090

New Corporate Hangar - TR-AP-08-02 - City of Ann Arbor
Addition, New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Ann Arbor, MI 48108

Murphy Oil #7092/7845 / Lapeer
Demolition, New Construction, Infrastructure - 1,400 SF
Design
$2,000,000 CJ est. value
Lapeer, MI 48446

Residential and Commercial Development
New Construction, Infrastructure - 11,623 SF
Design
$3,000,000 CJ est. value
Marquette, MI 49855

Miscellaneous Concrete/Asphalt Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Bay City, MI 48708

Fenton-Thompson Road Water Main Extension
Infrastructure
Bidding
$6,000,000 CJ est. value
Fenton, MI 48430

Columbiaville Elementary Site Work
Post-Bid
Less than $86,000 est. value
Columbiaville, MI 48421

Site Improvements and Extension of Existing Utilities
Infrastructure
Post-Bid
Ada, MI 49301

Replacement Sump Pumps At Townsend Towers
Renovation
Results
Dearborn, MI

Campbell Field - Site Preparation
Results
Muskegon, MI

PNC Bank Branch No. B605
Renovation
Construction
Kentwood, MI 49508

Action Mold and Machining Expansion
New Construction, Infrastructure - 15,400 SF
Construction
$4,400,000 CJ est. value
Wyoming, MI 49508

Detroit Center for Innovation - University of Michigan
New Construction, Infrastructure - 190,000 SF
Pending Verification
$250,000,000 CJ est. value
Detroit, MI 48226

Depot Street Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Ann Arbor, MI 48104

Fire Station 3 Replacement - MF-CB-18-03 - City of Ann Arbor
Demolition, New Construction, Infrastructure
Conception
$5,500,000 CJ est. value
Ann Arbor, MI 48103

Last Updated 09/23/2022 02:40 AM
Project Title

Claybanks Oil Co. Multi-Well Orphan Well Plugging Project (Oceana County) - 4 Wells

Physical Address View project details and contacts
City, State (County) Bitely, MI 49309   (Newaygo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Vendor Questions Due 10/21/22 3:00 PM ET Q & A Posted 10/25/22 Vendor Responses Due 11/1/22 Plugging, abandoning, and restoring the land at orphan well/facility locations. The work includes clearing the site of brush and trees, setting up the workover rig, tanks, flares, pumps, and specialized equipment. The wellbore will need to be cleaned out and electronically logged. Cementing will start at the bottom and work upward, making sure to seal all appropriate zones and formations as well as protecting the fresh water aquifer. Any abandoned tanks or vessels will need to be pumped out, steam cleaned, and prepared for scrap. All associated flowlines, electric lines, drums, buildings, secondary containments, fencing and debris will be removed and the site graded for final mulching and seeding.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents