Similar Projects
J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Design
Hines, IL 60141

HVAC Parts and Supplies
Alteration
Bidding
Chicago, IL

Repair HVAC and Pool / Jacoby Dickens Center / CSU
Infrastructure, Alteration
Bidding
Chicago, IL 60628

Furnace Inspection & Cleaning at Various Sites
Term Contract
Post-Bid
Evanston, Wheeling, IL

Boiler Tune-up at Various Locations
Post-Bid
Arlington Heights, Des Plaines, Evanston, Ford Heights, Franklin Park, Niles, Park Forest, Robbins, Wheeling, IL 60016

HVAC Equipment Replacement
Results
Evanston, IL 60201

Campus Building Automation System Upgrade
Results
$600,000 to $700,000 est. value
Chicago, IL 60621

Pre-Purchase of A Chiller
Alteration
Bidding
Palatine, IL

HVAC Maintenance
Term Contract
Post-Bid
Mount Prospect, IL 60056

Chiller Bundle Repair and Replacement
Results
Chicago, IL 60622

HVAC Service Contract
Alteration
Bidding
Oak Park, IL 60304

ABB HVAC Drivers
Post-Bid
Chicago, IL 60602

2020 TPPS Air Conditioning Units Replacement
Results
Tinley Park, IL 60451

2022 Renovations at Four Schools (Chiller Pre-Purchase)
Alteration
Bidding
Mount Prospect, IL 60056

Heating Small Construction Repairs in the Emergency Heating Repair Program - JOC
Term Contract
Post-Bid
Less than $1,800,000 est. value
Chicago, IL 60602

Reported 11/06/2021 12:00 AM
Project Title

OCC Mechanical Room Cooling - Ventilation Work

Physical Address View project details and contacts
City, State (County) Chicago, IL 60612   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install a new cooling system serving the basement mechanical room C114. The new system is comprised of a small modular AHU, separate exhaust fan, ductwork, supporting hydronic and electrical work, and DDC temperature controls. A new mechanical duct shaft will be routed from the basement mechanical room, through a janitorial space on the 1st floor, and terminate at new exterior louvers ont he south side of the building. The installation pathway for the new equipment is through existing precast concrete panels located on grade at the south side of the building on Fillmore Street. These panels will be removed, restored, and reinstalled in a weathertight manner. This portion of the scope needs to be coordinated with the facility in order to lessen the impact to the ADA entrance directly above. This project also includes repairs to a structural beam and associated structural members. Refer to the structural drawings for the nature of the scope. Unit pricing is also requested as part of this scope. Finally, this project includes a bid alternate for additional demolition of legacy mechanical equipment including absorption chillers, pumps, and accessories.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents