Similar Projects
D/B Western MATOC
Design
$1,000,000 to $70,000,000 est. value

Pacific West Area Indefinite Quantity Contract for Construction Services
Design
$2,000 to $25,000,000 est. value

New Washington County Administration Building
New Construction - 141,702 SF
Post-Bid
Less than $15,000,000 est. value
Saint George, UT

Z--Annex 1502000 Facility Investment Annex 1602000 Electrical
Post-Bid

Air Force Contract Augmentation Program (AFCAP) V
Results

Z--Simplified Acquisition of Basic Engineering Requirements (SABER)
Results
$10,000 to $40,000,000 est. value

Access Control Point Program Design Build II -- RFI(2)
Design

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Post-Bid
Less than $150,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Y--Sources Sought for IDIQ MACC for New Construction/Repair/Renovation of Various Heavy Horizontal and Civil Engineering Construction Projects at Locations within the NAVFAC SW AOR (CA, NV, AZ, CO, UT and NM)
Post-Bid
$300,000 to $25,000,000 est. value

Facilities Maintenance/Repair MATOC
Term Contract
Results

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Southeastern Utah Business Technical Assistance Center (BTAC)
Renovation
Post-Bid
Price, UT 84501

DFCM Construction-UDOT Peerless Port of Entry Station
Results
Less than $1,645,000 est. value
Price, UT 84526

Last Updated 07/23/2021 09:58 AM
Project Title

Improvements to the Carbon County Regional Airport

Physical Address View project details and contacts
City, State (County) Price, UT 84501   (Carbon County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $45,563,750
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work involved will include the following: Schedule I - Construct Snow Removal Equipment (SRE) Building

Details

Misc. Buildings, New Construction.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents