Similar Projects
High School Roofing Replacement and Renovations - HVAC Construction
Alteration
Bidding
$250,000 est. value
Plymouth Meeting, PA 19462

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Youth Center HVAC Cooling Tower and Building Automation Project
Results
Norristown, PA 19403

Municipal Hall Renovations - HVAC Construction
Results
$750,000 to $1,500,000 est. value
Norristown, PA 19401

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

HVAC Replacement Project
Results
Montgomeryville, PA 18936

HVAC & Refrigeration Replacement & Maintenance - NJ, NY & PA / Project # 44-21
Term Contract
Post-Bid
New York, NY

Arrowhead Elementary School - HVAC Construction
Results
Less than $3,548,850 est. value
Eagleville, PA 19403

Weatherization Services
Alteration
Post-Bid

Addition and Renovations to Eagleville Elementary School - HVAC Construction
Results
Less than $2,720,000 est. value
Eagleville, PA 19403

Chiller Replacement Program
Alteration
Post-Bid
Pottstown, PA

Simmons Elementary School Hot Water Valve Replacement
Renovation
Results
Horsham, PA 19044

Coil Degreaser Hvac Non-Toxic D4
Alteration
Post-Bid
Plymouth Meeting, PA 19462

Blair Mill Elementary School Boiler Room Valve Replacement
Results
Hatboro, PA 19040

Last Updated 12/14/2021 11:29 AM
Project Title

Penllyn Woods Community Center Hvac System Replacement

Physical Address View project details and contacts
City, State (County) Blue Bell, PA 19422   (Montgomery County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the furnish and installation of 1 Trane 7.5 ton Heat pump system, 1 Trane 5 ton Heat Pump System and the addition of three (3) Mitsubishi Ductless Hyper heating units in the men’s room, ladies room, and kitchen of the Penllyn Woods Community Center in Lower Gwynedd Township. Additional improvements include upgrades, repair, or replacement of any equipment electrical connections that are in poor condition or that are not up to code, the furnish and installation of a new custom transition to the existing supply, and a new custom return air base and new return air drop. The contractor will be responsible to connect to the existing electrical supplies in their current locations.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents