Similar Projects
Umatilla River - Mac Hoke Road (Bridge No. 24178)
Demolition, New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Echo, OR 97826

Region 2 ADA Single Ramp Failure Repairs
Infrastructure
Bidding
$300,000 CJ est. value
Salem, OR 97301

South West 209th Avenue Kinnaman Road to Alexander Street Precast Concrete Pipe and Structures
Alteration
Post-Bid
Hillsboro, OR 97129

Columbia Children's Arboretum Improvement Project
Alteration
Post-Bid
Portland, OR

Day Care Building - ADA Improvements
Renovation, Alteration
Results
$150,000 est. value
Lakeview, OR 97630

Concrete Installation Services
Alteration
Results
$150,000 est. value
Hillsboro, OR

Covered areas, Concrete Slabs, and Sidewalks
Infrastructure, Alteration
Post-Bid
$2,000,000 est. value
Brookings, OR 97415

Museum of the Oregon Territory Parking Lot Repair
Infrastructure
Results
$115,000 est. value
Oregon City, OR 97045

Concrete Installation, Repair and Maintenance Services
Alteration
Post-Bid
Salem, OR

Precast Concrete Storm Pipe and Structures for SW 209Th Ave
Alteration
Results
Hillsboro, OR

MPCO(Multi-layer Polymer Concrete Overlay) Epoxy for Salem Bridge Crew
Alteration
Post-Bid
Salem, OR

Bateman Creek Fish Passage and Habitat Enhancement
Infrastructure, Alteration
Results
$408,000 est. value
Gales Creek, OR 97117

On-Call Repair and Maintenance Services Retainer Contract
Alteration
Post-Bid
Eugene, OR

Diamond Lake Rescue Building
New Construction, Alteration
Results
Roseburg, OR

Concrete Pad replacement and Concrete Sidewalk and Pad
Infrastructure, Alteration
Results
$300,000 est. value
Culver, OR

Last Updated 11/01/2022 12:01 PM
Project Title

Main Campus Takena Elevator and Phase II Remodel Project

Physical Address View project details and contacts
City, State (County) Albany, OR 97321   (Linn County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $470,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Linn-benton Community College Main Campus Takena Elevator and Phase Ii Remodel Project, a Public Improvement Project Each Bidder Shall Comply With the Requirements of the Prevailing Wage Rate Law in Ors 279c.800 to 279c.870; Equal Opportunity Requirements; and Provide Worker's Compensation Insurance for Its Employees as Per Ors 656.029. All Subject Employers Working Under the Contract Are Either Employers That Will Comply With Ors 656.017 or Employers That Are Exempt Under Ors 656.126. No Bid May Be Withdrawn After the Time and Date Set for the Bid Opening. The Board of Education, Linn-benton Community College, May Waive Any or All Informalities and Irregularities, May Reject Any Bid Not in Compliance With All Prescribed Public Procurement Procedures and Requirements, and May Reject for Good Cause Any or All Bids Upon a Finding of the College That It is in the Public Interest to Do So. Linn-benton Community College is an Equal Opportunity Employer and Educator. Bid Bond: 5% Performance Bond: 100% Payment Bond: 100% Date of substantial completion is July 14, 2023. After this date, damages of $1,000 per business day will be incurred by General Contractor. Substantial completion will be determined as the date that systems are substantially complete and the Owner can occupy or use the area. Full installation of the elevator may extend beyond that date with expected completion no later than September 15, 2023.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents