Similar Projects
Highland Elementary School Central Plant Upgrades
Term Contract
Bidding
$1,200,000 est. value
Mesa, AZ 85213

Chiller Plant And Water Tower Maintenance And Repair
Post-Bid
Glendale, AZ

PM for Sterizone Sterilization System VP4 and ON2 Oxygen Concentrators
Post-Bid
Phoenix, AZ 85016

Collection System Odor and Corrosion Control
Results
Chandler, AZ 85225

Job Order Contractor For Parks And Recreation
Results
Less than $5,000,000 est. value
AZ

J046--644- Water Treatment Services
Post-Bid
Phoenix, AZ 85012

Qualified Select Bidders List / HVAC Mechanical Yard - Lomas Elementary
Term Contract
Results
Phoenix, AZ 85044

4410--Diagnose and Repair Boiler Safety Devices
Post-Bid
Phoenix, AZ

Citywide Mechanical and Plumbing Contracting Services JOC
Term Contract
Results
$5,000,000 est. value
Scottsdale, AZ

H345--644-Boiler End of Life Study
Post-Bid
Phoenix, AZ 85012

Carson JR High School P.E. Hot Water Boiler Replacement
Results
Mesa, AZ 85201

J041--644 Boiler Water Treatment
Post-Bid
Phoenix, AZ 85012

Boiler Maintenance and Repair Services
Term Contract
Results
Phoenix, AZ

Dual Pump Condensate Tank Unit Replacement/Installation
Term Contract
Post-Bid
Phoenix, AZ 85004

4410--644 Survey Design Install Boiler Quick Connects
Term Contract
Post-Bid
Phoenix, AZ 85012

Reported 07/22/2021 12:00 AM
Project Title

4410--644 Survey Design Install Boiler Emergency/ Auxiliary Connection

Physical Address View project details and contacts
City, State (County) Phoenix, AZ 85012   (Maricopa County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Services to survey, design, and install a quick connect setup that will allow an auxiliary, 350 BHP, dual fuel (Natural Gas / #2 Fuel Oil), 250 PSI (120 psi working pressure) steam boiler to be rapidly deployed at the Phoenix VA Medical Cente

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 40 - Process Integration, Process Control Auxiliary Devices.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents