Similar Projects
Drainage Improvements at Colt Andrews School
Infrastructure
Bidding
Bristol, RI 02809

Supply of Drainage Pipe
Post-Bid
Woonsocket, RI

High Density Polypropylene Pipe
Term Contract
Post-Bid
Warwick, RI

F--Drilling Svcs in Massachusetts and Rhode Island
Results

F--Drilling Svcs in Massachusetts and Rhode Island
Results

Retaining Wall Replacement
Infrastructure
Post-Bid
Woonsocket, RI

Drilling IDIQ in Massachusetts and Rhode Island
Results

Sidewalk, Road, and Drainage Construction
Infrastructure
Post-Bid
Central Falls, RI

Installation of Drainage City Wide
Term Contract
Results
Woonsocket, RI

NAVFAC Bulkhead Repairs, S45N
Alteration
Post-Bid
$5,000,000 to $10,000,000 est. value
Newport, RI

Route 1 Post Road Drainage
Results
North Kingstown, RI 02852

Frames, Grates, and Covers
Term Contract
Post-Bid
Warwick, RI

Drilling IDIQ In Massachusetts and Rhode Island
Results

Walley Beach and Halsey Herreshoff Park Seawall Restoration
Results
RI

Drainage Improvements - Scituate High School
Results
Scituate, RI 02857

Reported 03/31/2022 12:00 AM
Project Title

Tanyard Brook Culvert Replacement Phase III Project

Physical Address View project details and contacts
City, State (County) Bristol, RI 02809   (Bristol County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work in this Contract includes, but is not limited to: Removal and disposal or abandonment-in-place of existing stone masonry culvert, and associated drainage structures and pipes; Installation of a three (3) foot by eight (8) foot closed precast concrete box culvert sections including culvert transitions and bend sections; Furnish and installation of new drainage manhole and catch basin structures, castings, and drainage pipes; Modifications to existing utility (storm water and water) pipelines and structures, including (but not limited to) removal or abandonment-in-place, replacement, and new installation of water lines and valves; Temporary flow diversion and/or bypassing of stormwater and flows; Other related civil/site work necessary to complete the project as designed;

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents