Similar Projects
Reported | 03/31/2022 12:00 AM |
Project Title | Tanyard Brook Culvert Replacement Phase III Project |
Physical Address | View project details and contacts |
City, State (County) | Bristol, RI 02809 (Bristol County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work in this Contract includes, but is not limited to: Removal and disposal or abandonment-in-place of existing stone masonry culvert, and associated drainage structures and pipes; Installation of a three (3) foot by eight (8) foot closed precast concrete box culvert sections including culvert transitions and bend sections; Furnish and installation of new drainage manhole and catch basin structures, castings, and drainage pipes; Modifications to existing utility (storm water and water) pipelines and structures, including (but not limited to) removal or abandonment-in-place, replacement, and new installation of water lines and valves; Temporary flow diversion and/or bypassing of stormwater and flows; Other related civil/site work necessary to complete the project as designed; |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |