Similar Projects
2022 Lead Service Line Replacements
Infrastructure
Bidding
$1,000,000 est. value
Inkster, MI

Reconstruction of Plainfield Avenue From Marywood Drive to Ellsmere Street
Infrastructure
Bidding
$4,113,931 est. value
Grand Rapids, MI 49525

Augusta Bunton Pump Force Main
Post-Bid
$650,000 est. value
Willis, MI 48191

T4: Infrastructure
Post-Bid
Highland, MI

Hangar 665 Expansion and Watermain Upgrades Project
Addition - 22,000 SF
Results
Less than $10,000,000 est. value
Gwinn, MI

Dunmore, Waverly, Weldon, Hartford Water Main Replacement Project
Results
Ann Arbor, Hartford, Waverly, MI

Reconstruction of Giddings Avenue From Burton Street to Boston Street
Infrastructure
Bidding
$2,666,216 est. value
Grand Rapids, MI 49507

Replacement of Steam Manhole 81
Post-Bid
Lansing, MI 48937

Remick Drive Water Main Replacement
Results
Clinton Township, MI 48036

2022-2023 DWRF Water Main Replacement Project
Infrastructure
Bidding
$200,000 est. value
Eastpointe, MI

DWRF Water Service Replacement Project
Post-Bid
McBain, MI 49657

23 Mile Road Water Main
Results
Chesterfield, MI

North River Park Water Main Improvements
Infrastructure
Bidding
$200,000 est. value
Inkster, MI 48141

Water Meter Installation
Term Contract
Post-Bid
Detroit, MI

Lead Service Line Replacement and Service Line Materials Verification Program
Results
Ferndale, MI

Last Updated 06/03/2022 01:06 AM
Project Title

Cadotte Avenue Water Main Replacement

Physical Address View project details and contacts
City, State (County) Mackinac Island, MI 49757   (Mackinac County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $650,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Project 3750 Syd Pavement Removal 2340 Ft Water Main, 12-inch, DI 850 Ft Water Services, Open Cut, 1-inch 250 Ft Water Services, Tunnel or Bore, 1-inch 4050 Syd Aggregate Base, 8-inch 3750 Syd Temporary Gravel Surface Course, 4-inch 880 Tons HMA, 4EML

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents