Grade, Drain and Surface - IS 35
Alteration
Conception
$10,000,000 est. value
Norman, OK 73069

Grade, Drain and Surface - IS 35
Alteration
Conception
$10,000,000 est. value
Norman, OK 73069

Wastewater Treatment Plant Improvements South Canadian Wastewater Treatment Plant
Renovation, Infrastructure
Design
$203,529,800 CJ est. value
Oklahoma City, OK 73170

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Moore Station Expansion
Addition, Demolition, Renovation, Infrastructure
Bidding
$3,000,000 CJ est. value
Moore, OK 73160

Norman Line Maintenance Facility Bid Package #1
New Construction, Infrastructure
Sub-Bidding
$3,650,000 CJ est. value
Norman, OK 73069

Norman Line Maintenance Facility Bid Package #1
New Construction, Infrastructure
Sub-Bidding
$3,650,000 CJ est. value
Norman, OK 73069

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Sewer Force Main Improvements - HDPE Pipe and Plug Valve
Infrastructure
Results
Moore, OK

Resurface (Asphalt)
Infrastructure
Results

Utilities - US 77
Infrastructure
Conception
$1,000,000 est. value
Noble, OK 73068

Grade, Drain, Bridge and Surface
Infrastructure
Design
$15,000,000 CJ est. value
Noble, OK 73068

Kunkle Valve Replacement
Alteration
Post-Bid
Norman, OK 73019

Slabjacking and Subsealing Services
Infrastructure
Results

Last Updated 08/24/2022 02:01 PM
Project Title

Eastern Ave Widening and Reconstruction SE 19th St to SE 4th St

Physical Address View project details and contacts
City, State (County) Moore, OK 73160   (Cleveland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Traffic Control Signal Systems, Street/Road Intersection Construction and Repair, Street/Road Lane Construction and Repair, Traffic Control Devices (Signals, Signing, etc.), Stormwater Improvements. Construct approximately 6,353 Linear Feet of Roadway Widening and Reconstruction from SE 4th St to SE 19th St. The reconstruction includes grading, drainage, surfacing, signing & striping, and traffic control. Signals will be upgraded to radar detection at the intersections of Eastern Ave. and SE 19th St. and Eastern Ave. and SE 4th St. Sidewalk will be placed along the west side of the project in locations that currently dont have existing sidewalk or where the existing sidewalk is being removed as a part of the project. A 10-foot-wide multi-use trail will be constructed on the east side for the length of the project. A reinforced concrete box extension will be constructed north of the Eastern Ave. and SE 12th St. intersection to accommodate the widened typical section.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents