Similar Projects
Last Updated | 05/22/2023 04:33 PM |
Project Title | Gopher Valley Road Bridge Replacement |
Physical Address | View project details and contacts |
City, State (County) | Sheridan, OR 97378 (Yamhill County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected March 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $1,088,089 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work will consist of replacing Bridge #11822 with a new vehicular bridge, AC pavement, water quality swale, and other items detailed in the plans and specifications, located in Yamhill County, Oregon. The Geotechnical, Hydraulic, and Stormwater reports are available upon request. Engineers Estimate ranges from $700K to $775K. Each bidder must identify whether the bidder is a resident bidder, as defined in ORS 279A.120. If a bid is received from a non-resident bidder, the provisions outlined in ORS 279A.120 will apply to said bid after the bid is opened and before the contract is awarded. No bid shall be received or considered unless the bidder is registered with the Construction Contractors Board as specified in OAR 137-049-0230. The Board of Commissioners, Yamhill County, reserves the right to waive minor informalities and to reject any or all bids that do not comply with prescribed public contracting procedures and requirements, including the requirement to demonstrate the bidders responsibility under ORS279C.375(3)(b), or if Yamhill County finds that it is in the public interest to do so. Each Bidder shall submit the subcontractors disclosure form required by OAR 137-049-0360 within two (2) working hours after the bid closing (prior to 4:00 p.m.) in a separate envelope marked Gopher Valley Road Bridge Replacement Subcontractors Disclosure Form. No bid will be received or considered by the County Engineering Manager unless the bid contains a statement by the bidder that the provisions of ORS 279C.530 shall be complied with. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |