Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

FY 2021-22 Annual Pavement Preservation Project (Zone 6)
Term Contract
Bidding
$6,200,000 est. value
Yorba Linda, CA

Camino Capistrano Pavement Rehabilitation Project
Infrastructure
Bidding
$8,500,000 est. value
San Juan Capistrano, CA

Modify Striping and Signs, Update Curb Ramps and Signals
Infrastructure
Post-Bid
$271,815 est. value
Fullerton, CA

FY 2020/2021 Annual Roadway Resurfacing Project
Alteration
Post-Bid
Dana Point, CA

Place Hma and Perforated Plastic Pipe Underdrain
Infrastructure
Results
$16,200,000 est. value
CA

San Clemente Campground Asphalt Repairs
Infrastructure
Results
$20,000 est. value
San Clemente, CA 92672

Residential Slurry Seal and Miscellaneous Rehabilitation FY21-22
Infrastructure
Bidding
$750,000 est. value
Fullerton, CA

Prospect and Spring Right Turn Lane Modification
Term Contract
Post-Bid
Orange, CA 92869

FMS Paving and Lighting
Infrastructure, Alteration
Results
$1,500,000 est. value
Los Alamitos, CA 90720

Asphalt Pavement Maintenance
Infrastructure
Bidding
$200,000 est. value
Brea, CA

Curb Ramp Installation in Maintenance Zone 5
Alteration
Post-Bid
Huntington Beach, CA

City Bridge Maintenance Project
Infrastructure
Results
$710,000 est. value
Newport Beach, CA

Estancia High School Asphalt Paving Replacement
Infrastructure
Bidding
$525,000 est. value
Costa Mesa, CA 92627

Beverly Neighborhood Street Rehabilitation
Alteration
Post-Bid
Orange, CA

Reported 05/11/2022 12:00 AM
Project Title

Culver Drive Pavement Rehabilitation

Physical Address View project details and contacts
City, State (County) Irvine, CA 92604   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $1,240,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed shall include, but not be limited to: Cold milling, roadway excavation and paving; removal and replacement of asphalt pavement, concrete curb, gutter, curb ramps, and sidewalk; utility protection, cooperation and coordination; pavement delineation and signing; traffic signal modification; and adjustment of IRWD and other utility facilities; adjusting valve covers and manhole covers to grade, and other items not mentioned here, but are required by the plans and the Special Provisions. PROJECT LOCATION AND SCHEDULE: The work to be performed hereunder is located in the City of Irvine, County of Orange, on Culver Drive between Walnut Avenue and the Interstate-5 Freeway. 80 working days to complete.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents