Similar Projects
Bordeaux Creek Aquatic Habitat
Renovation, Infrastructure
Bidding
Lincoln, NE

Fort Atkinson Park Entrance
New Construction, Infrastructure
Bidding
Less than $5,000,000 est. value
NE

Construction Management at Risk (CMR) Services - Central Park Pavilion and Site Improvements
New Construction
Post-Bid
La Vista, NE 68128

Norris Elementary Playground Improvements
Renovation
Post-Bid
Omaha, NE 68137

Adams Park Green Infrastructure 2021
Infrastructure
Results
Omaha, NE

Fontenelle Park Green Infrastructure 2021 Maintenance
Infrastructure
Results
Omaha, NE 68104

Gering School Tennis Courts
Renovation
Pending Verification
Gering, NE

Island Oasis Park Upgrades
Renovation, Alteration
Pending Verification
Grand Island, NE

Stolley Park Splash Pad
Addition
Bidding
Grand Island, NE 68801

Disney Elementary Swings Improvements
Renovation
Post-Bid
Omaha, NE 68137

Hitchcock Park Green Infrastructure 2021
Renovation
Results
Omaha, NE

New Stolley Park Playground
New Construction
Post-Bid
Grand Island, NE 68803

Recreation Center Track Resurface
Infrastructure
Results
Less than $200,000 est. value
Wayne, NE

Park Sprayground
Renovation
Post-Bid
NE 68107

Offutt AFB Tennis Court Resurface
Term Contract
Results
Offutt Air Force Base, NE

Reported 03/16/2022 09:38 AM
Project Title

UNL Outdoor Track Replacement-Phase 2

Physical Address View project details and contacts
City, State (County) Lincoln, NE 68588   (Lancaster County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value $4,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of masonry, precast and metal panel buildings, both 2 stories, with the purpose of serving the track as well as bleacher and grandstand seating and any associated mechanical, plumbing, and electrical work. The north building is primarily track storage, viewing, time keeping and an enclosed throws room. The south is primarily concessions, hospitality, restrooms, changing rooms and an observation deck. This project includes site work, demolition, earthwork, and concrete for sidewalks and parking associated with the buildings. Note the rough building pad earthwork was part of the first phase of this project which included the adjacent track.

Details

Park/Playground, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents