Similar Projects
SR 20/Tributary to Thornton Creek - Culvert Replacement
Infrastructure
Conception
$871,000 CJ est. value
Twisp, WA 98856

SR 20/Tributary to Thornton Creek - Culvert Replacement
Infrastructure
Conception
$871,000 CJ est. value
Twisp, WA 98856

Salmon Meadows Road Rehabilitation
Infrastructure
Design
$1,000,000 CJ est. value
Conconully, WA 98855

Salmon Meadows Road Rehabilitation
Infrastructure
Design
$1,000,000 CJ est. value
Conconully, WA 98855

SR 20, Kearney St I/S Roundabout
Infrastructure
Bidding
$1,250,000 CJ est. value
Twisp, WA 98856

Town of Twisp SPCC Overlay
Infrastructure
Bidding
$500,000 CJ est. value
Twisp, WA 98856

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

Thorndyke Road MP 4.71 Culvert Replacement
Infrastructure
Results
$1,656,400 est. value

6th Street Improvements Project
Infrastructure
Results
$661,391 CJ est. value
Coulee Dam, WA 99116

Armstrong Peel Smith Creek Watershed Water Quality Project 2022
Infrastructure
Construction
$4,000,000 CJ est. value
Nespelem, WA 99155

Armstrong Peel Smith Creek Watershed Water Quality Project 2022
Infrastructure
Construction
$4,000,000 CJ est. value
Nespelem, WA 99155

SPCC Overlay
Infrastructure
Bidding
$500,000 CJ est. value
Twisp, WA 98856

In-Stream Fish Weir Design at Salmon Creek Road and Salmon Creek
Infrastructure
Post-Bid
Okanogan, WA

Old 97, Verestar to Plata
Infrastructure
Results
$1,308,354 CJ est. value
Brewster, WA 98812

Last Updated 06/05/2023 05:45 PM
Project Title

Channel Realignment and Bank Protection in Salmon Creek

Physical Address View project details and contacts
City, State (County) Nespelem, WA 99155   (Okanogan County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Confederated Tribes of the Colville Reservation (CTCR) Anadromous Fisheries Division is seeking proposals from construction companies capable of completing habitat restoration project at - RM 1.0 on Salmon Creek as designed (see attachment). The project, once awarded, is expected to be completed within three weeks. The Colville Confederated Tribes Anadromous Fisheries Division in a continued effort to rehabilitate habitat to benefit native salmonids has conducted site surveys within Salmon Creek. The site surveys and meeting with adjacent landowner resulted in a design that has been supported by the landowner and City of Okanogan. The purpose of the project is to redirect stream flow into a single-channel and away from an actively eroding and unstable stream bank. Perennial flow is managed from two storage reservoirs in the upper watershed. Currently the summer/winter base flow is targeted at 3 cfs during the time of construction. This flow will likely need to be diverted during construction. The structural components of the design are large wood measuring 22 to 35 feet in length have been secured but will need to be transported from the current location to the site (approximately 5 miles). Three to four ft. diameter boulders required for the ballast of the logs will likely be available on site. The five to six ft. diameter boulders will need to be transported to the site. The Tribes reserves the right to reject any or all proposals, to waive any minor informalities or irregularities contained in any proposal, and to accept any proposal deemed to be in the best interest of the Tribes. Deadline for questions: June 14, 2023 Unauthorized contact with other tribal employees regarding this RFP may result in disqualification. All oral communications will be considered unofficial and non-binding on the Tribes. All questions must be submitted no later than 5:00 p.m., PST, June 14, 2023.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents