Similar Projects
Fire Station Renovation & Addition
Renovation, Addition
Conception
Highland Beach, FL 33487

Fire & Police Training Facility
New Construction
Conception
$7,100,000 est. value
West Palm Beach, FL

Tuttle Royale
New Construction, Infrastructure
Design
$279,600,000 CJ est. value
Royal Palm Beach, FL 33411

AutoZone #5999 / Wellington
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Village of Wellington, FL 33414

RFQ Contractor - Morikami Park - BIWA Pavilion Rehabilitation
Infrastructure
Bidding
$300,000 CJ est. value
Delray Beach, FL 33446

Installation of Bleacher Covers at Lake Catherine Sports Complex
Infrastructure
Bidding
$300,000 CJ est. value
Palm Beach Gardens, FL 33403

CVS #7891 Parking Lot ADA Improvements / Lake Worth - Rebid
Infrastructure
Post-Bid
$100,000 CJ est. value
Lake Worth, FL 33467

Fire Station 45 - Bunk Room Addition
Addition
Post-Bid
$1,500,000 est. value
Delray Beach, FL 33446

City Fire Rescue Facilities - Fire Station No. 88
Results
Riviera Beach, FL

Fire Station 40
New Construction - 6,700 SF
Results
West Palm Beach, FL

Home Depot Site Work at Alton
New Construction
Construction
Palm Beach Gardens, FL 33418

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Villages of Windsor
New Construction, Infrastructure
Pending Verification
$71,000,000 CJ est. value
Boynton Beach, FL 33426

PopStroke Golf Facility - Delray Beach
New Construction, Infrastructure - 4,500 SF
Pending Verification
$1,760,000 CJ est. value
Delray Beach, FL 33483

North Fire Station 2 Restoration
Renovation
Conception
$390,000 est. value
Palm Beach, FL 33480

Last Updated 09/28/2022 07:33 AM
Project Title

Agriculture Reserve North Fire Station - Palm Beach County

Physical Address View project details and contacts
City, State (County) Palm Beach Gardens, FL 33412   (Palm Beach County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2026
Bids Due View project details and contacts
Estimated Value $5,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the construction of a new permanent three-bay fire station with a new battalion headquarters complex to serve the expansion of the northern part of the Agricultural Reserve. The primary users of this facility will be firefighters and paramedics assigned to this station. As of September 28, 2022, this project is currently in the FY 2022-2026 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2022. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents