Similar Projects
Demolition of Existing Flat Roof/Ceiling
Post-Bid
Gays Mills, WI

Remodeling and Repairs at 4042 N 64th Street
Renovation
Post-Bid
Milwaukee, WI 53216

Fire Station No. 8 Roof and Door Replacement
Results
Eau Claire, WI 54703

Roof Replacement - Oconomowoc Readiness Center
Results
Less than $50,500 est. value
Oconomowoc, WI

Roofing Repair and Maintenance
Post-Bid

Fire Department Building Roof Repair
Results
North Prairie, WI 53153

Remodeling and Repairs at 3936 N 25th Street
Renovation
Post-Bid
Milwaukee, WI 53206

Winneconne WWTF Roof Improvements
Results
Winneconne, WI 54986

Courthouse South Penthouse Roof Replacement
Post-Bid
Wausau, WI 54403

Bay Beach Wildlife Sanctuary - Observation Building Reroofing
Results
Green Bay, WI 54302

UW Heating Plant Roof Replacement
Post-Bid
Wausau, WI 54401

Roof Replacement
Results
$250,000 to $500,000 est. value
Madison, WI 53706

Re-Roofing At Madison View Apartments
Renovation
Post-Bid
Madison, WI

Roof Replacement Milwaukee Field Maintenace Shop
Results
Less than $163,000 est. value
Milwaukee, WI

Complete Roof Replacement
Post-Bid
Lancaster, WI

Reported 04/01/2022 12:00 AM
Project Title

UW - Whitewater Rock County Roof Replacement

Physical Address View project details and contacts
City, State (County) Janesville, WI 53546   (Rock County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of roof membrane replacement on Roof Area 9 at UW-Whitewater Rock County in Janesville, Wisconsin for Rock County. The Work includes: 1. Related sheet metal and carpentry work, as indicated within the Construction Drawings. a. Note: Sheet A4.1 indicates where each individual perimeter detail applies. 2. Replacement of any wet/damaged existing insulation, as needed. 3. Installation of 2’x2’x2” concrete pavers around the HVAC unit, The specification is based on Carlisle, Firestone, or Mule-Hide 60-mil EPDM roof system with a twenty (20) year warranty (excluding existing insulation). Contractor’s wishing to use a system from another roof system manufacturer must gain prior approval, per the specified substitution request requirements

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents