Similar Projects
Reported | 08/17/2021 11:40 AM |
Project Title | Final Effluent Pipeline Project |
Physical Address | View project details and contacts |
City, State (County) | Syracuse, UT (Davis County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Final Effluent Pipeline consists of approximately 6.25 miles of 63-inch diameter pressurized High Density Polyethylene (HDPE) Diameter Ratio (DR) 26 pipe, stainless steel (SST) air vents, one SST access manway, a buried SST tee for potential future connection to Ogden Spur, a concrete outfall and energy dissipation structure, a rip-rap channel, and an earthen channel connecting to the Great Salt Lake (GSL). Effluent will be discharged from North Davis Sewer District’s (NDSD) wastewater treatment plant to the GSL via a new outfall located approximately 5.5-miles from the entrance to Antelope Island State Park on the north side of the causeway. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |