Similar Projects
7-8 Grade Center Bid Period 2
Renovation
Bidding
Glendale Heights, IL 60139

CPS Carver DEM
Renovation
Bidding
Chicago, IL 60827

New Innovative Center & School Renovations
Renovation
Post-Bid
Carol Stream, IL 60188

North High School Master Facility Plan
Post-Bid
Downers Grove, IL 60515

Oak Park & River Forest HS South Cafeteria Phase I
Renovation
Results
Oak Park, IL 60302

Orozco School Environmental Abatement
Renovation
Results
Chicago, IL 60608

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

STEM Lab & Administration Center
Renovation
Bidding
Matteson, IL 60443

ICR Wendell Phillips Academy HS
Post-Bid
Chicago, IL 60653

Disney II Magnet HS Convent Building Tuckpointing
Results
Chicago, IL 60602

2021 - Building Improvements
Renovation
Bidding
Grand Ridge, IL

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Accessibility and Miscellaneous Work at Mille Proegler School
Results
Kankakee, IL 60901

2021 Site and Life Safety Work at Multiple Sites
Bidding
Palos Park, IL 60464

Fitness Addition - East Building Addition Phase II
Addition - 89,000 SF
Post-Bid
Lincolnshire, IL 60069

Reported 04/13/2021 12:00 AM
Project Title

2021 General Remodeling at Lockport Township High School

Physical Address View project details and contacts
City, State (County) Lockport, IL 60441   (Will County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but is not limited to, the following: select interior demolition and remodeling in and around the existing library that includes new partition wall construction, painting, finished flooring and ceilings, doors and hardware, glass office partitions, casework, and other miscellaneous work. HVAC, electrical, and plumbing replacements are included in this area as well.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents