Similar Projects
Tijeras Senior Center Expansion
Addition - 3,800 SF
Construction
Tijeras, NM 87059

Crownpoint Youth Complex - Phase Two
New Construction - 27,140 SF
Results
Crownpoint, NM 87313

Mora County Senior Center Addition and Alterations
Renovation, Addition
Results
Mora, NM 87732

Construction of a New Senior Center
New Construction - 7,500 SF
Construction
$2,850,000 est. value
Rio Rancho, NM 87144

New Hondo Senior Citizen Center
New Construction
Results
Hondo, NM 88336

Mora County Senior Center Kitchen Addition and Alterations
Addition - 505 SF
Post-Bid
Mora, NM 87732

Gerhart Apartments
New Construction - 110,890 SF
Construction
$10,000,000 CJ est. value
Santa Fe, NM 87507

The Commons at Martineztown
Renovation
Post-Bid
$6,100,000 est. value
Albuquerque, NM 87102

Community Center Building Renovations Phase II
Renovation
Post-Bid
Las Cruces, NM 88029

Villa Sendero Apartments
New Construction - 236,609 SF
Design
$10,000,000 CJ est. value
Santa Fe, NM 87507

Wintergreen Luxury Apartments
New Construction - 246,944 SF
Design
Albuquerque, NM 87114

Design Build Hillsboro Community Center-Historical
Results
Hillsboro, NM 88042

Construction of the Sabinal Community Center - Phase IV
New Construction
Results
Less than $350,610 est. value
Sabinal, NM 87006

Renovation of the San Jose Senior Center
Renovation
Results
Carlsbad, NM 88220

Ruidoso Downs Senior Center Renovations
Construction
Carrizozo, NM

Reported 06/24/2021 12:00 AM
Project Title

Senior Center Addition

Physical Address View project details and contacts
City, State (County) Mayhill, NM 88339   (Otero County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements consist of: mobilization and demobilization; addition of a wood stud conventional framed building/slab on grade; interior and exterior improvements consisting of approximately: three windows and one door; installation of new metal panel; remove board and batt siding on rear of building; Labor and materials used for site preparation consisting of approximately 250 tons of basecourse; demo wood, VCT; tile in existing building; installation of concrete foundation slab and related concrete work; wood blocking/backing; framing; insulation; gutters at existing building and new building ; snow stops; install doors and windows; glazing or hollow metal jambs. Interior improvements such as drywall finishes; painting; vinyl cove base installation; acoustic ceiling; flooring; toilet partitions; building expansion joint; fire protection; plumbing and plumbing fixtures; gas piping; access panels; HVAC; electrical; lighting; utility tie ins; asphalt paving; rock removal if required; ADA Compliance; and related improvements.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents