Similar Projects
New Roof System
Post-Bid
Dover, OH

Gutknecht Canopy Damage Repair
Post-Bid
Youngstown, OH 44503

UC Memorial Hall Roof & Facade
Results
Less than $3,582,500 est. value
Cincinnati, OH

Westfall Elementary School Roof Replacement
Results
Less than $590,000 est. value
Williamsport, OH 43164

Subway - Roof Replacement
Renovation, Alteration - 1,472 SF
Construction
Martins Ferry, OH 43935

Sullivan Township Gymnasium Building Roof Repair
Post-Bid
Sullivan, OH 44880

UC Logan Hall Roof Replacement
Results
Less than $414,832 est. value
Cincinnati, OH

Weatherization and Energy Efficiency Programs
Alteration
Post-Bid
Ravenna, Warren, OH

UC Kettering Kehoe-Mid Wing Roof Replacement
Results
Less than $1,250,000 est. value
Cincinnati, OH 45267

Carport the Beams
Alteration
Post-Bid
Albany, OH

Woodland Hills Roof Replacement
Results
East Liverpool, OH 43920

Turtle Creek Correction Center Roof Replacement
Alteration
Post-Bid
$535,000 est. value
Lebanon, OH 45036

Roof Replacement 480 South High Street
Results
Less than $189,579 est. value
Columbus, OH 43215

Cass Township Hall Roof Improvements Project
Alteration
Post-Bid
OH

Second Ward Community Initiative Community Center Roof Project
Results
Less than $134,000 est. value
Delaware, OH 43015

Last Updated 08/29/2022 11:34 AM
Project Title

Hoover High School Roof Project

Physical Address View project details and contacts
City, State (County) North Canton, OH 44720   (Stark County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $80,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Hydrovac loose pea gravel from the roof 2. Remove all sleeper curbs not in use and stacks. 3. Remove old air handler unit including ductwork above and below the roof deck. a. Patch decking and insulation as needed with like kind and size. 4. Install parapets at all wall locations. All internal parapets walls will be covered completely with fanfold and Duro-Last. a. If existing roof is not Duro-Last then 1.25 termination bar and caulking will be used to seal membrane. b. External parapet walls will use Duro-Last 2-piece compression metal. c. Inspect wood nailers prior to attaching 2-pecie compression metal and replace or add as needed to secure the 2-piece compression metal. 5. Install Vi fanfold over entire deck surface with tapered insulation between the drains. a. Taper will be min of % inch per foot of fall 6. Premanufactured stacks and curbs 7. Install one 2-way air vent per 1000 Square feet 8. EPDM to be cut and relieved of stress prior to installation. On built-up roof all blisters will be cut and removed prior to installation of new roof. 9. Install Walk pads at all Ladders, Service Equipment, and gas line supports 10. Membrane will be a White 50 mil Duro-Last 11. Provide 20-year NDL warranty 12. Leave site clean 13. Re-install lightning rods 14. Roof sections to be completed: See attached map at end of this posting. There are three sections outlined in red, all to be bid as one comprehensive job. No alternates. Estimated combined square footage is 32,800, but that should be verified by bidders prior to submittal of bids.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents