Similar Projects
New Falls Road HSIP; Design activities limited to: ADA Ramps
Infrastructure
Bidding
$1,000,000 to $2,499,999 est. value
PA

2022 Curb Ramp Installation
Infrastructure
Bidding
Warminster, PA

Driveway/Parking Lot Improvements & Sidewalk Installation
Renovation
Post-Bid
Plumsteadville, PA 18949

Race Street ADA Curb Ramp Renovations
Infrastructure
Post-Bid
Philadelphia, PA 19107

Converting Paved Play Areas into Faculty Parking Lots and Construct New Paved Driveway at the Lower Southampton Elementary School
Results
$1,800,000 est. value
Feasterville, Trevose, PA 19053

Facility`s Parking Lot Paving Project
Results
Penndel, PA 19047

Lower Makefield Trail - Design Activities Limited to: ADA Curb Ramps
Infrastructure
Bidding
$500,000 to $999,999 est. value
PA

Phase 1 High School/Middle School Parking Lots
Infrastructure, Alteration
Post-Bid
$1,400,000 to $1,650,000 est. value
Perkasie, PA 18944

Sarmiento Drive Drainage Improvement Project
Results
Bensalem, PA 19020

Bedminster ES Paving and Deibler ES and South MS Sidewalk Replacement Project
Infrastructure
Bidding
Perkasie, PA 18944

New Road Trail
Infrastructure
Post-Bid
Richboro, PA

2020 Handicap Accessible RAMP Project 2
Term Contract
Results
Bensalem, PA

Concrete Sidewalk and Curb Installation and Replacement
Infrastructure
Post-Bid
Bensalem, PA

Bridge Street PA DCED Multimodal Grant Pedestrian Improvement Project
Results
New Hope, PA 18938

Recreational Trail Extension
Results
$359,944 est. value
Perkasie, PA 18944

Last Updated 02/15/2022 11:03 AM
Project Title

2022 Multimodal Transportation Fund Program

Physical Address View project details and contacts
City, State (County) Perkasie, PA 18944   (Bucks County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract includes a base bid for the removal and replacement of concrete curb, sidewalk and curb ramps, installation of concrete sidewalk and driveway aprons, removal of asphalt trail, and installation of asphalt trail, retaining wall, fencing, signage, pavement markings, landscaping, and amenities at specified locations along S. 7th Street, S. 9th Street and the old Liberty Bell Trolley rail line within Perkasie Borough.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents