Similar Projects
Eastern Branch Lynnhaven River Dredging - 100152 - Virginia Beach
Infrastructure
Conception
$3,999,935 CJ est. value
Virginia Beach, VA 23451

Eastern Branch Lynnhaven River Dredging - 100152 - Virginia Beach
Infrastructure
Conception
$3,999,935 CJ est. value
Virginia Beach, VA 23451

Checkered Flag Genesis Dealership
New Construction, Infrastructure - 12,000 SF
Design
$3,700,000 CJ est. value
Virginia Beach, VA 23452

Princess Ann Plaza Drainage - City Of Virginia Beach
Infrastructure
Design
$1,750,000 CJ est. value
Virginia Beach, VA 23451

Wawa #8678 / Virginia Beach
New Construction, Infrastructure - 6,049 SF
Post-Bid
$1,600,000 CJ est. value
Virginia Beach, VA 23451

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

Oceanfront Water Meter Vault Replacement Phase I
Infrastructure
Results
Virginia Beach, VA

Society At Gateway
New Construction, Infrastructure - 342,614 SF
Construction
$123,000,000 CJ est. value
Virginia Beach, VA 23462

Atlantic Park Entertainment Venue
New Construction, Infrastructure - 70,400 SF
Construction
$45,000,000 CJ est. value
Virginia Beach, VA 23451

Green Clean Auto Wash
New Construction, Infrastructure - 4,500 SF
Pending Verification
$1,200,000 CJ est. value
Virginia Beach, VA 23452

Project Door - Taylor Farm Warehouse / Distribution And Office
New Construction, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Virginia Beach, VA 23454

Parliament Drive Sidewalk Phase I - PG100555 - City of Virginia Beach
Infrastructure
Conception
$729,706 CJ est. value
Virginia Beach, VA 23462

Tennis Court Renovations - Phase 2 - PG601002 - City of Virginia Beach
Renovation, Infrastructure
Design
$2,825,000 CJ est. value
Virginia Beach, VA 23451

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Last Updated 06/27/2023 05:02 PM
Project Title

Eastern Shore Drive Drainage Phase II - Cape Story Pump Station - City of Virginia Beach

Physical Address View project details and contacts
City, State (County) Virginia Beach, VA 23454   (Virginia Beach City County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $10,722,490 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is interconnected with the Eastern Shore Drive Drainage (ESDD) - Phase IB - Lynnhaven Colony Park Pump Station project and the ESDD -Phase ID - Lynnhaven Colony Dr. Pump Station project. The three projects work together to improve stormwater management within the Lynnhaven Colony neighborhood and relieve widespread flooding. Portions of Lynnhaven Colony are located in low lying areas that flood during moderate to severe rain and high. This facility is the main conveyance channel for the Lynnhaven Colony watershed and will provide the necessary hydraulic connections to proposed Lynnhaven Colony Park Pump Station and Lynnhaven Colony Drive Pump Station. This project will construct Phase II drainage improvements for Cape Henry Canal as well as relocate a gravity sanitary sewer from the existing canal to be located within Cape Henry Drive. This project is included in the City of Virginia Beach FY 2022-2027 CIP. As of June 27, 2023, design is underway. A team has not been identified. Advertise to bid in early 2024 and construction start mid 2024 with completion in late 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents