Similar Projects
Santee Experimental Forest Beaver Control
Design
Cordesville, SC 29434

SC Licensed Residential Contractors For Energy Efficiency Measures
Term Contract
Bidding
Charleston, SC

General Construction Services (Statewide)
Term Contract
Bidding
SC

Emergency/Disaster Response and Recovery Services for Horry County Emergency Operations Center
Post-Bid
Conway, SC

Pest Control Management
Post-Bid
Columbia, SC 29207

Pressure Washing Ballfield Bleachers and Stadiums
Results
Fort Mill, SC 29715

Lead And Asbestos Testing
Results
Mullins, SC

Pest Control Services
Alteration
Bidding
Spartanburg, SC 29306

Pest Control Services
Term Contract
Post-Bid
Marion, SC 29571

Summer 2020 Pressure Washing Services
Results
Less than $36,333 est. value
Charleston, SC 29424

Bus cleaning services
Term Contract
Post-Bid
Greenville, SC 29601

Provide and Service Portable Toilets
Term Contract
Results
Conway, SC 29528

Pressure Washing Darlington County Courthouse
Post-Bid
Darlington, SC 29532

Portable Showers
Results
Eastover, Wateree, SC 29044

Pressure Washing Service at SPHS Stadium
Post-Bid
Rock Hill, SC 29730

Reported 09/29/2021 12:00 AM
Project Title

Soft Wash and Pressure Wash Building 920

Physical Address View project details and contacts
City, State (County) North Charleston, SC 29406   (Charleston County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work is to provide pressure washing for Building 920 on the Thornley Campus. Soft wash: • The exterior of the building from the top of the building to ground level. • Brick wall on the side of the 920 building. • The portico in the front of the building. • All glass and metal awnings on the building. • All brick pavers, walkways and other pavers in walkways. • The brick pavers in the roadway in front of the 920 building. • All metal on the exterior of the building including metal doors and columns. Clean: • The exterior of the windows after soft washing with Tucker Pole using ionized water so that the windows will not be streaked or spotted from the soft washing process Pressure wash: • All of the concrete sidewalks, pads, loading docks, walls, gutter drains, ramps, landing, steps, stairs, concrete walls, picnic tables and concrete pads, curbs associated with sidewalks around the 920 building. • The entire side walk going to rear parking lot on College Drive. • Concrete pad in the rear of the building to the parking lot bollards. • The seating area in the rear of the building with recycled plastic slats and concrete ash urns.

Details

Division 02 - Existing Conditions, Physical Decontamination, Surface Cleaning Decontamination, High-Pressure Water Cleaning Decontamination.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents