Similar Projects
CCSD Modular Furniture
Bidding
San Antonio, TX 78243

Countertop Replacement - Arlington Hall
Alteration
Bidding
Arlington, TX 76010

Drinking Fountain Replacement
Post-Bid
Less than $450,000 est. value
TX

Walls and Finish - New Weight Room
Post-Bid
Kemp, TX 75143

Anti-Ligature Related Facility Alterations - at Rusk State Hospital
Renovation
Results
$4,800,741 est. value
Rusk, TX 75785

Rusk State Hospital Ceiling Tile Replacement
Results
$60,000 est. value
Rusk, TX 75785

Brownfield Restroom
Alteration
Bidding
Brownfield, TX 79316

Warehouse Improvements
Post-Bid
Hooks, TX 75561

Drywall Services
Results
Less than $150,000 est. value
Round Rock, TX 78664

Counter Top Replacement at Fire 3
Alteration
Bidding
Mansfield, TX

Acoustical Wall Panel Stevenson Elementary School Gymnasium
Post-Bid
Rockwall, TX 75087

Paint Booth
Results
Less than $88,035 est. value
Livingston, TX 77351

Attic Insulation Project
Alteration
Bidding
Corsicana, TX 75110

Entry Canopy and Reception Upgrades
Post-Bid
Less than $3,670,910 est. value
Houston, TX 77072

Dining and Decor for Donna High School
Term Contract
Results
Donna, TX 78537

Last Updated 05/18/2021 09:20 AM
Project Title

San Marcos AO - Interior Refresh

Physical Address View project details and contacts
City, State (County) San Marcos, TX 78666   (Hays County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $24,950
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Interior refresh at the San Marcos Area Office. 1. This list is generic in nature for major items and intended only to give an overview of general project scope. 2. Remove any hardware, hardware accessories, electrical plates and covers, light fixture trims, and similar items, to be stored and reinstalled after painting complete. 3. Painted walls will be repainted. 4. Repair holes in walls as required and prep walls for paint finish. 5. Tape and float new walls for paint 6. All walls shall have a level 5 finish minimum with splatter texture. 7. Prep and paint walls included in the scope of work. Color to be SW 7567 Natural Tan-semi gloss finish or equivalent. 8. Prep and paint accent walls included in the scope of work. Color to be SW 6102 Portabella-semi gloss finish or equivalent. 9. Prep and paint hard ceilings included in the scope of work. Color to be ceiling white flat finish or equivalent. 10. Paint closets and storage rooms in each office and corridor identified. 11. All steel doors and frames in outlined project areas to receive a new coat of paint. Paint both sides of doors. Color to be determined by TXDPS. 12. Wood door frames will be painted to match adjacent wall. 13. Rooms that have vinyl wallcovering will NOT be painted 14. Provide turnkey project as indicated on the drawings and as required for complete project.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents