Similar Projects
Chestnut Hill Road Storm Sewer Project - Phase 2
Bidding
Center Valley, PA

Lousiana Avenue Stormwater Improvements - Phase 2
Bidding
Dormont, PA 15216

Cast Iron Frames and Grates
Post-Bid
Greensburg, PA 15601

Parkview Storm Sewer Replacement
Post-Bid
Bellwood, PA 16617

Twin Oaks Storm Sewer Piping Project
Results
Gettysburg, PA

2019 Blairsville Highway Turn Back Project Old Main Street and South Liberty Street
Results
Blairsville, PA

Southern Avenue Storm Sewer Repair
Bidding
Penn Hills, PA 15235

2020-21 Waste Water and Stormwater Products
Term Contract
Post-Bid
Mechanicsburg, PA 17050

Stormwater Improvements 18th, Vine, and Beech Streets
Results
New Florence, PA

Linden Street Stormwater Improvement Project
Bidding
Clarks Summit, PA 18411

Bayard Street Storm Sewer Separation Phase 3 and 4
Post-Bid
Elizabeth, PA 15037

2019 South Avenue Area Sewer Rehabilitation Project - PH
Results
$450,000 to $500,000 est. value
Wilkinsburg, PA

Highland Park Roadway Reconstruction and Storm Sewer Improvements
Bidding
Palmer, PA

2020 Site Improvements Project
Post-Bid
Mount Carmel, PA 17851

Brookville Municipal Authority – East Main Street Water and Sanitary Sewer Replacement
Results
Less than $300,000 est. value
Brookville, PA

Last Updated 04/16/2020 08:45 AM
Project Title

Stormwater Installation Project

Physical Address View project details and contacts
City, State (County) Ebensburg, PA 15931   (Cambria County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bids from qualified Bidders to acquire and install approximately 394 LF of 8 "SDR-35 stormwater pipe in the Borough of Ebensburg, Pennsylvania. The project begins in the 200 block where an existing 12" sanitary sewer line is to be uncovered, cut and then connected to the new 8" stormwater pipe. The other end of the existing 12" sanitary sewer pipe will be plugged at that point. The new 8" SDR-35 pipe will then cross Caroline Street and continue along Sample Street to Poplar Street, where it will terminate in an existing catch basin, a distance of 394 LF.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents