Similar Projects
Last Updated | 01/10/2023 08:32 PM |
Project Title | Re-bid Health/Life Safety Improvements HVAC Upgrades Milburn Campus O'Fallon Township High School |
Physical Address | View project details and contacts |
City, State (County) | O Fallon, IL 62269 (Saint Clair County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $931,696 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | According to Contract Documents prepared by FGM Architects Inc., 475 Regency Park, Suite 325, O'Fallon, Illinois 62269; phone 618.624.3364; fax 618.624.3369. Works consists of HVAC Upgrades and associated work at Milburn Campus of O'Fallon Township High School. CONTRACT TYPE Bids will be based on a single lump sum general construction contract. Bids shall include not less than the prevailing hourly wage rate determined by the Illinois Department of Labor. Purchase cost is non-refundable. Additional shipping/handling charges may apply and are non-refundable. Contact Snow Printing for exact shipping/handling charge. Contractors may obtain up to two (2) copies of contract documents. BID STIPULATIONS Bid Security is required in the amount of ten (10) percent of Proposal. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. Within ten (10) days after notification of award of contract, the successful Contractor shall furnish a Performance Bond, separate Labor and Material Payment Bond, and Insurance in a form acceptable to Owner. The Performance Bond shall be in the amount of 100 percent of the accepted bid. The performance bond will become a part of the contract. Failure of the successful bidder to enter into contract and supply the required bonds and Certificate of Insurance within ten (10) days after the prescribed forms are presented for signature or within such extended period as the Owner may grant shall constitute a default. All bids submitted shall be valid for a period of at least sixty days from bid opening; the only alterations which will be allowed will be those approved by the Owner. Owner reserves the right to reject any or all proposals, to waive informalities in bidding, and to award a Contract for any part of the Work or the Project as a whole. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |