Similar Projects
Construction of the Remodel Fire Station 3
Renovation
Post-Bid
Bentonville, AR

Construction of Arkansas State Police Troop G Substation
New Construction
Post-Bid
Texarkana, AR

Fire Station Bathroom Renovations
Renovation
Post-Bid
Humnoke, AR

Fire Station Improvements
Renovation
Post-Bid
AR

Construction Manager for the City of Bentonville Fire Training Facility Project
New Construction
Post-Bid
Bentonville, AR

Construction Manager Pulaski County Fire Protection District 5 Sherwood Fire Department Station 4
New Construction
Post-Bid
Sherwood, AR 72116

12th Street Station Tenant Improvements
Renovation
Post-Bid
Little Rock, AR 72204

Benton Fire Station #6
New Construction - 5,603 SF
Post-Bid
Benton, AR 72019

Malvern Police Station
Renovation
Post-Bid
Malvern, AR 72104

Fire Station 3 Renovation
Renovation
Design
Conway, AR

Construction of Police Department Headquarters - Work Package 4
New Construction - 59,557 SF
Post-Bid
Fayetteville, AR

Fire Station Renovations
Renovation
Design
Perryville, AR 72126

Fire Station Bathrooms and HVAC Improvements
Renovation
Post-Bid
Humnoke, AR

Bald Knob Fire Station 3
Renovation - 7,200 SF
Results
Bald Knob, AR

Reported 12/14/2021 12:00 AM
Project Title

Construction of a Metal Building 60-Foot Wide by 40-Foot Deep with 3 Bay Doors

Physical Address View project details and contacts
City, State (County) Paron, AR 72122   (Pulaski County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work Requirements include: Construction of a metal building 60-foot wide by 40-foot deep with 3 bay doors. • Foundation: • Install and finish a 6-inch concrete slab on current grade (pad has already been constructed). • Accommodate a building 40’L x 60’W with high strength concrete slab • Support heavy trucks parked, estimated at 3,000 psi or greater strength • Have a slick finish • Accommodate floor water drains at each truck bay for drainage while maintaining slope and thickness to accommodate integribidty and strength. • Accommodate water, sewer, gas and electric utilities in slab where needed to be contracted separately with another contractor • Building: • Construct a metal building sized 40’L x 60’W, with either a metal frame or strong timber frame • Roof should have 4:12 or similar pitch to support appropriate wind and snow loads for this area. • Building height is estimated as 14’4” • Include 3 insulated rollup doors sized 12 ’x 12’ across the front. Doors should have at least 2 small windows per door. • Two 6`8" x 3` man doors on right side at front bay and back corner for ingress/egress • Building must have suitable insulation for acceptable energy efficiency. • Building colors for the metal exterior are red with white trim. • Building frame and exterior must support wind and snow loads for this region. Provide codes or ratings for roof loads/wind loads and specifications for all materials.

Details

Fire/Police Station, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents