Similar Projects
Wastewater Pump Station Improvements
Design
North Bay Village, FL

Orange County Southwest Service Area Potable Water Storage and Repump Facility and Avalon Road Master Pump Station
Bidding
Less than $18,954,291 est. value
Winter Garden, FL 34787

District II - Robena Road Booster Pump Station
Bidding
Jacksonville, FL 32218

Bayshore Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $3,500,000 est. value
Tampa, FL 33602

Sulphur Springs Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $16,800,000 est. value
Tampa, FL 33602

Professional Design Build Services for Construction Of The David L. Tippin Water Treatment Facility High Service Pump Station and Misc. Improvements
Results
Less than $50,000,000 est. value
Tampa, FL 33610

Lanark East Lift Station
Results
Carrabelle, FL

Bradley Road Booster Pump Station
Construction
Less than $7,884,680 est. value
Jacksonville, FL 32246

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

Deep Injection Well Pump Station Utilities and Concrete Containment
Bidding
$1,500,000 est. value
Naples, FL 34117

Wastewater Pump Station Construction and Rehabilitation Contractor Services Contract
Post-Bid
Maitland, FL

Lift Station Rehabilation 2019
Results
Less than $57,000 est. value
Ocala, FL 34471

Packing District Park - Master Lift Station Upgrades
Renovation
Construction
Orlando, FL 32869

Long Avenue Water and Sewer Improvements
New Construction
Bidding
Less than $5,000,000 est. value
FL 32456

Kaye Street Re-Pump Station Building Expansion
Addition
Post-Bid
West Palm Beach, FL

Last Updated 03/10/2021 11:32 AM
Project Title

Ponce Inlet Lift Station Building Remodel

Physical Address View project details and contacts
City, State (County) Ponce Inlet, Port Orange, FL 32127   (Volusia County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This is for the construction of the Ponce Inlet Lift Station Building Remodel. The work consists of furnishing all labor, equipment, and materials for the construction of the facilities consisting of, but not limited to, the following: Remodel of existing Ponce Inlet lift station building, including: a new roof, exterior finish upgrades, new landscaping and irrigation system upgrade.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents