Similar Projects
Willow Unit Flooring Replacement at MSH St. Peter
Renovation
Sub-Bidding
$170,000 CJ est. value
Saint Peter, MN 56082

Law Enforcement Center Flooring Project
Alteration
Post-Bid
Hastings, MN 55033

Pickett Place Flooring
Alteration
Post-Bid
Austin, MN 55912

Flooring Replacement Services
Term Contract
Results
MN

Red Rock Elementary School - Flooring Replacement
Alteration
Results
Woodbury, MN 55125

Windom WMD HQ Carpet
Term Contract
Post-Bid
Windom, MN 56101

Liberty Ridge Elementary School - Flooring Replacement
Alteration
Results
Woodbury, MN 55129

Bridge Decking Planking
Term Contract
Post-Bid

Grey Cloud Elementary School - Flooring Replacement
Alteration
Results
Cottage Grove, MN 55016

Flooring Services
Alteration
Post-Bid
Farmington, MN

Middleton Elementary School - Flooring Replacement
Alteration
Results
Woodbury, MN 55125

2022 Lino Lakes Rookery Improvement
Alteration
Post-Bid
Lino Lakes, MN 55014

Goodhue CD 1 Tile Repair and Improvement
Alteration
Results
Kenyon, MN

Replace Dish Room Flooring at the Minnesota History Center
Alteration
Post-Bid
$55,800 est. value
Saint Paul, MN 55102

Edina Schools 2022 Reroofing
Renovation
Results
$1,772,792 CJ est. value
Edina, MN 55435

Last Updated 03/22/2023 08:34 PM
Project Title

Riverview Elementary Flooring Replacement

Physical Address View project details and contacts
City, State (County) Farmington, MN 55024   (Dakota County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $505,275 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For Riverview Elementary Flooring Replacement 4100 208th Street West Farmington, Minnesota 55024 This project includes: Removal of existing carpet, VCT flooring, vinyl base and replacement with new carpet. Make proposals on the bid forms supplied in the Project Manual. No oral, telegraphic or telephonic proposals or modifications will be considered. Submit with each bid, a certified check or acceptable bidder's bond payable to Independent School District #192 in an amount equal to five percent (5%) of the total bid. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond, and Performance Bond. Bids may not be withdrawn within thirty (30) days after the scheduled time of opening bids, without the consent of the Owner. The Owner reserves the right to accept any bid or to reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding. The Owner requires Substantial Completion for phase 1 of the project on or before August 16, 2023 and phase 2 of the project on or before August 9, 2024. Additional phasing requirements are provided in the construction documents. Bidding documents, including the Proposal Form, Drawings and Specifications, will be on file at the Offices of the Architect, Wold Architects and Engineers, 332 Minnesota Street, Suite W2000, Saint Paul, Minnesota 55101. (651)

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents