Similar Projects
SR 20/Eagle Vista Dr to Ault Field Rd Vic - ADA Compliance
Infrastructure
Design
$668,000 CJ est. value
Oak Harbor, WA 98277

SR 20/Boon Rd Vic to Eagle Vista Dr Vic - Paving
Infrastructure
Design
$1,241,000 CJ est. value
Coupeville, WA 98239

Expansion and Upgrading of the Existing Electrical Substation
Infrastructure
Bidding
$340,000 CJ est. value
Camano Island, WA 98282

Coupeville Wharf Pile Repairs
Infrastructure
Bidding
$930,000 CJ est. value
Coupeville, WA 98239

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Hoypus Point Restoration
Infrastructure
Post-Bid
$200,000 to $240,000 est. value
Oak Harbor, WA

Deer Lake Access Redevelopment - Rebid
Infrastructure
Results
$91,766 CJ est. value
Clinton, WA 98236

Deer Lake Access Redevelopment & Lake Cavanaugh Asphalt Paving, Pile Driving & Float Installation
Infrastructure
Results
$247,955 CJ est. value
Clinton, WA 98236

SR 20 / W Fakkema Road - Intersection Improvements
Infrastructure
Design
$804,000 CJ est. value
Ault Field, WA 98277

Port of Coupeville Fuel Tank Replacement
Infrastructure
Bidding
$250,000 CJ est. value
Coupeville, WA 98239

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

2022 Sanitary Sewer Rehabilitation Project (Pipe-bursting)
Infrastructure
Results
$519,139 CJ est. value
Oak Harbor, WA 98277

East Cranberry Lake Dock Replacement at Deception Pass State Park
Infrastructure
Post-Bid
$850,000 CJ est. value
Oak Harbor, WA 98277

Ault Field Road/Goldie Road Traffic Signal Improvements
Infrastructure
Results
$1,306,464 CJ est. value
Oak Harbor, WA 98277

RFQ Engineering - Robinson Road Fish Passage Culvert Replacement
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Freeland, WA 98249

Last Updated 07/05/2023 04:11 PM
Project Title

P-260 P-8A Aircraft Airfield Pavement

Physical Address View project details and contacts
City, State (County) Whidbey Island Naval Air, WA 98278   (Island County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Aircraft Hangar, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

THIS PROJECT CONSISTS OF DRAWINGS SHOWING REPLACEMENT OF SELECTED DETERIORATED AIRFIELD PAVEMENT ALONG TAXIWAY ECHO AND THE RUNWAY 25 THRESHOLD, INCLUDING CONSTRUCTION OF NEW APRON PAVEMENT ADJACENT TO TAXIWAY CHARLIE WITHIN THE TRANSIENT RAMP, ALL LOCATED WITHIN THE NAVAL AIR STATION WHIDBEY APPROXIMATELY 390,585 SQUARE-FEET OF EXISTING CONCRETE TAXIWAY PAVEMENT AND ASPHALT CONCRETE SHOULDER PAVEMENT WILL BE REMOVED AND REPLACED ALONG TAXIWAY ECHO, AND NORTH APRON, REPLACE PAVEMENT MARKINGS IN KIND APPROXIMATELY 258,943 SQUARE-FEET OF EXISTING CONCRETE RUNWAY PAVEMENT INCLUDING ASPHALT CONCRETE SHOULDER PAVEMENT WILL BE REMOVED AND REPLACED AT THE RUNWAY 25 THRESHOLD APPROXIMATELY 84,189 SQUARE-FEET OF NEW TAXILANE/APRON CONCRETE PAVEMENT INCLUDING ASPHALT CONCRETE SHOULDERS WILL BE CONSTRUCTED ADJACENT TO TAXIWAY CHARLIE AT THE TRANSIENT RAMP. NEW STORMWATER CONVEYANCE SYSTEMS WILL BE INSTALLED AT THE INFILL AREAS TO CONVEY RUNOFF TO OIL WATER SEPARATOR (OWS) #8, WITH RESIZING/REHABILITATION OF EXISTING DOWNSTREAM STORMWATER CONVEYANCE PIPES AT TAXIWAY JULIET, WITHIN THE NORTH RAMP, AND BEFORE OWS #8. NEW EDGE LIGHTING FIXTURES AND OTHER SUPPORTING ELECTRICAL INFRASTRUCTURE WILL BE INSTALLED AT THE INFILL AREAS TO SUPPORT THE EXTENDED PERIMETER

Details

Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents