Similar Projects
Secant Wall Construction, Montgomery L/D, Ohio River, PA
Design
$5,000,000 to $10,000,000 est. value
Monaca, PA

Emergency Repairs Hughesville Streambank Protection Project
Infrastructure
Bidding
Hughesville, PA

Retaining Wall Repair
Infrastructure
Bidding
$110,000 to $150,000 est. value
Steelton, PA 17113

Birchwood Lakes Community Association Road Paving And Drainage
Renovation
Post-Bid
Dingmans Ferry, PA 18328

Stabilization of Gabion Basket Wall
Post-Bid
Home, PA 15747

McNay Ridge Road (T-350) Slide Repair
Results
Wind Ridge, PA 15380

Mchenry Road Culvert Project
Results
Benton, PA 17814

Plum Run Stream Restoration Phase 3
Infrastructure
Bidding
West Chester, PA 19382

Alparon Park Drainage Repair
Renovation
Post-Bid
Troy, PA 16947

SR 2022 Over Unamed Tributary to Bennys Run
Results
$200,000 to $499,999 est. value
PA

SR 2003 Over Chaney Run-1 - DFB
Infrastructure
Bidding
$200,000 to $499,999 est. value
PA

23 NC SGL 37 Stephenhouse Road Maintenance
Post-Bid
PA

East Dobbins Landing Seawall Replacement
Results
Erie, PA 16507

Smooth Interior Corrugated Polyethylene Drainage Pipe
Infrastructure
Bidding
North Huntingdon, PA

Keyhole Road Culvert Replacement Project
Post-Bid
Holbrook, PA 15341

Last Updated 08/13/2021 12:57 AM
Project Title

SR1022 ov Allen Creek 2

Physical Address View project details and contacts
City, State (County) PA   (Tioga County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 to $499,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The description and location of the project are as follows: This work is the furnishing and installation of a 20’-0” x 10’-6” precast reinforced concrete box culvert, inlet section, and outlet section over an unnamed tributary to Hammond Creek and selective tree removal at a Department prepared site all within a length of 568.55 linear feet (0.108 miles) all as indicated on the approved drawings included in the bid package for State Route 1022, Section 025 from approximately 0.36 miles northwest of the intersection with State Route 328 at Segment 0080 Offset 0984 to approximately 0.29 miles southeast of the intersection with Township Road 787 (Skyline Drive) at Segment 0090 Offset 0344 in Jackson Township, Tioga County. 0608-0001 Lump Sum 1.000 01 n x Mobilization 0689-0001 Lump Sum 1.000 01 n x Narrative Schedule 4810-0050 Lump Sum 1.000 01 n Yes a, m1 Std Selective Tree Removal (Includes Seeding And Mulch) 0901-0001 Lump Sum 1.000 01 n q Std Maintenance And Protection Of Traffic During Construction 1002-0053 Pound 325.000 02 n s7 Reinforcement Bars, Epoxy Coated 5085-0100 Linear Foot 54.000 02 n Yes s4 Std Precast Reinforced Concrete Box Culvert (20'-0" x 10'-6") 5085-0186 Each 1.000 02 n Req s4 Std Precast Reinforced Concrete Inlet Section 5085-0187 Each 1.000 02 n Req s4 Std Precast Reinforced Concrete Outlet Section

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents