Similar Projects
Willmar City Hall
New Construction
Conception
Willmar, MN

Dodge County Wind Project
New Construction, Infrastructure
Conception
$300,000,000 CJ est. value
Dodge Center, MN 55927

Hayward Solar Project
New Construction, Infrastructure
Design
$128,000,000 CJ est. value
Hayward, MN 56043

City Hall and Community Center - City of Willmar
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Willmar, MN 56201

Roof Replacement, Round Top Window Replacement and Exterior Painting - Red Lake County Courthouse
Renovation
Bidding
$300,000 CJ est. value
Red Lake Falls, MN 56750

Main Substation Improvements
Demolition, New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Le Sueur, MN 56058

Public Works Facility
New Construction - 60,000 SF
Post-Bid
$12,000,000 est. value
Orono, MN 55356

Community Solar Garden Subscriptions
New Construction
Post-Bid
Faribault, MN 55021

Power Plant Generation Addition
Addition
Results
Luverne, MN

Olmsted County Justice Center Remodel - General Construction Package
Renovation
Results
Rochester, MN 55904

County Courthouse Renovation - Hubbard County
Renovation
Pending Verification
$1,218,500 CJ est. value
Park Rapids, MN 56470

Community Solar Garden
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Big Lake, MN 55309

Fourmile Wind Project
New Construction, Infrastructure
Conception
$25,000,000 CJ est. value
Fairmont, MN 56031

Revitalization of the Town Hall Building
Renovation
Design
$20,000,000 CJ est. value
Ely, MN 55731

Red Lake County Courthouse Exterior Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Red Lake Falls, MN 56750

Last Updated 03/17/2023 06:39 AM
Project Title

RFP D/B - Edina City Hall Exterior Improvements and PV

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55424   (Hennepin County)
Category(s) Government/Public, Industrial/Manufacturing
Sub-Category(s) Capitol/Court House/City Hall, Power Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $1,976,352 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Edina City Hall - Exterior Improvements & PV at Edina City Hall 4801 W. 50th Street, Edina, MN 55424. Project includes replacement of existing roofing system with new; misc. caulking and sealant repairs to building envelope; removal of existing solar array and components, design and installation of new solar array system. The work shall consist of furnishing labor, equipment, and materials necessary to complete design and specifications provided for project by HGA, Inc. Bids will be considered via online submission. Questions are due by February 08, 2023 by end of business dayThe Edina City Council will meet at a future date to consider said bids. Project includes replacement of existing roofing system with new; misc. caulking and sealant repairs to building envelope; removal of existing solar array and components, design and installation of newsolar array system. 1. This project's goal is to improve the energy efficiency and extend the Edina City Hall's exteriorenvelope lifespan. The scope of work includes a new rooftop solar photovoltaic system, new roof, exterior envelope improvements, and miscellaneous work such as a new exterior roof access ladder, skylight replacements, rooftop mechanical screening adjustments, and a motorized crane within the mechanical penthouse. 2. The new rooftop solar array is a static, ballasted system designed to be installed over a new single-ply EPDM roof. See the drawings and specifications for the system size and design requirements. All efforts should be made to comply with the design intent for reuse of electrical pathways into the facility as well as creating safe walkways to service the panels extending from the center of the roof. 3. To support the longevity of the solar installation, improve the energy efficiency of the facility, and correct existing roof drainage issues, the existing ballasted, built-up roofing system is to be replaced with a new single-ply EPDM roof. The existing roof and insulation will be removed down to deck and new insulation installed to meet current code R-values and improve slopes to the existing roof drains, which are to remain in place. Parapet copings are to be removed and replaced with new material to match the associated exterior elevations. Select locations will receive new or extended parapets to receive the increased insulation thickness. 4. In 2020 the City Hall performed a blower door test and smoke wand analysis to evaluate the building's tightness. The test resulted in normal air leakage at sealant joints around windows and storefront. To improve performance as well as rectify typical aging of the facade, the project will replace all surface accessible sealant joints as well as primary sealant joints as shown in the drawings. In addition, the stone masonry is to be cleaned and re-tucked to improve building tightness, rain water shedding, and extend the life space of the stone facades. HGA No- 3857-014-00

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Exterior Specialties, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents