Similar Projects
Northwest 112th Place Road Infrastructure Surtax - STC073870 - Marion County
Infrastructure
Conception
$741,307 CJ est. value
Morriston, FL 32668

Northwest 112th Place Road Infrastructure Surtax - STC073870 - Marion County
Infrastructure
Conception
$741,307 CJ est. value
Morriston, FL 32668

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Silicone Joint Sealer
Infrastructure
Results

District Two Bridge Tending Services
Infrastructure
Results

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Northwest 145th Avenue Road Infrastructure Surtax - STC073875 - Marion County
Infrastructure
Conception
$252,000 CJ est. value
Williston, FL 32696

SR 25 (US 41 / US 441) from I-75 (SR 93) to CR 252
Infrastructure
Post-Bid
$9,805,526 est. value

Safety Project/Pavement Markings - Districtwide Safety Push Button, on System (2nd)
Infrastructure
Results
$999,993 est. value

RFP Engineering - SR 55 (US 19) From Terra Ceia Rd to I-275
Infrastructure
Post-Bid
$15,847,904 CJ est. value
Inglis, FL 34449

Remove Built up Soil and Vegetation from the Outfall Ditches
Infrastructure
Results
$800,000 est. value

Road Resurfacing
Infrastructure
Post-Bid
$300,000 est. value
Yankeetown, FL

Last Updated 09/27/2023 12:19 PM
Project Title

Resurfacing - SR 500

Physical Address View project details and contacts
City, State (County) Bronson, FL 32621   (Levy County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $3,471,985 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Levy Road Name: SR 500 (US 27A) Limits: From Mp 22.304 to Mp 23.269 Project(s): 44549115201(*) Federal Aid No: D223049B Total Roadway Length: 0.965 Miles Contract Days: 180 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.965 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 days Description: The Improvements under this Contract consist of milling & resurfacing, base work, shoulder treatment, drainage improvements, curb & gutters, traffic signals, highway signing, sidewalks/bicycle path, and other incidental construction on SR 500 from beginning curb and gutter to end curb and gutter in Bronson, Levy County. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. Question Deadline 09/06/2023 Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. FDOT - Call Order 003: Resurfacing - SR 500

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents