Similar Projects
5th & 7th Street Improvements PY21, (South of Adams Street)
Infrastructure
Bidding
Brooklyn, IL 62059

6th Street Improvements
Infrastructure
Bidding
Brooklyn, IL 62059

Van Buren Street Resurfacing
Post-Bid
New Athens, IL 62264

Parking Lot Repairs
Post-Bid
$250,000 to $500,000 est. value
East Saint Louis, IL 62201

Presidential Street Improvement Phase V and West Presidential Street Improvements Phase 1
Results
O'Fallon, IL

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

Add Right-Turn Lanes on Westbound Highway 50 and on Southbound Old Collinsville Road with Traffic Signal Modifications, Sidewalks, Curb and Gutter, and Pavement Markings in o'Fallon
Infrastructure
Bidding
$5,000,000 est. value
IL

Central Division - Asphalt Paving Maintenance
Post-Bid

Millstadt - PY 2019 CDBG - Laurel Street Improvements - 600 and 700 Block - Phase 1
Results
Less than $95,000 est. value
Millstadt, IL

Construct Runup Ramp and Taxiway Access from the Airfield, including Jet Blast/ Noise Mitigation Barrier
Infrastructure
Bidding
IL

Loop Creek Park - Phase 2 Improvements
Renovation
Post-Bid
Belleville, IL 62221

2.8 Miles of Partial Depth Patching on I-55 / I-70 between the Bando Railroad and IL 111
Results
IL

West A Street, 13th-17th Street - Street Improvement Project
Infrastructure
Bidding
$280,000 est. value
Belleville, IL

Olivette Neighborhood Street Improvements - Phase 3
Post-Bid
Belleville, IL

Standard Overlay Resurfacing, Patching and Guardrail Improvements on Il 157 From Petroff Drive In Caseyville to State Street In Caseyville; and Il 157 Interchange Ramps To St. Clair Avenue / Il 111
Results
IL

Last Updated 04/20/2022 02:38 PM
Project Title

Parking Improvements

Physical Address View project details and contacts
City, State (County) East Saint Louis, IL 62205   (Saint Clair County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $81,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

BASE BID: Work at the Family Living Center consists of hot-mix asphalt surface removal, resurfacing with 2” HMA pavement, pavement repair and pavement area expansion. Work also includes a new manufactured pedestrian shelter on new concrete pad, new manufactured storage shed and all other incidental work required to complete the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents