Similar Projects
RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

Repair and Replace Water Supply System Rebid
Infrastructure
Bidding
$150,000 est. value
Monee, IL 60449

Various Locations Drainage and Grading Improvements Project
Infrastructure
Bidding
$200,000 CJ est. value
Crete, IL 60417

Routine Maintenance of Existing Street Lights
Post-Bid
Homer Glen, IL

BHS South Lot Rehabilitation
Post-Bid
Romeoville, IL

The Improvement Consists of Cleaning (Daytime Sweeping) Various Expressways Throughout District One in Various Counties
Results

The Improvement Consists of Cleaning (Nighttime Sweeping) Various Expressways Throughout District One in Various Counties
Results

Vetter Road Segment II Roadway Reconstruction & Realignment Drainage Improvements
Addition
Construction
Joliet, IL

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

Standard Overlay, ADA, Culvert Repairs
Infrastructure
Bidding
$300,000 est. value
Mokena, IL 60448

Commissioners Park and Dupage River Sports Complex Parking Lot Renovations
Post-Bid
Naperville, IL 60565

Lake Strini Improvements.
Results
Romeoville, IL

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Design
Schaumburg, IL 60194

Helen Avenue (Charity Avenue - Mills Road) Roadway Improvement Project - 2022
Infrastructure
Bidding
$200,000 est. value
Joliet, IL 60433

Last Updated 07/22/2022 05:36 AM
Project Title

RFQ - IL 7 from 131st St to 135th St, Phase III Project

Physical Address View project details and contacts
City, State (County) Homer Glen, IL 60491   (Will County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Roadway Lighting, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Job No. C-91-325-19, IL 7 from 131st St to 135th St, Phase III Project, Cook County, Region One/District One. This project may contain Federal Funds. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on August 4, 2022, at 11:00 AM at the Region One/District One Office in Schaumburg. Phase III engineering is required to provide construction inspection services for the above subject improvement. Work includes, but is not limited to, Full HMA pavement reconstruction of IL-7 from 500 feet South of 135th Street to 131st Street, roadway alignment shift 16 feet west and 1.8 feet above existing profile, HMA resurfacing and widening of IL-7 500 feet North of 131st Street, class D pavement patching, culvert replacement, traffic signal modernization, ditch grading and realignment of Mill Creek, drainage improvements, detention basin, ADA improvements, shareduse path and sidewalk along IL-7, retaining wall, RR Flagger use, as well as all incidental and collateral work necessary to complete the project as shown on the plans and as described herein. The following structures may be in this project: o S.N. 016-1396: Existing Box Culvert along East side of IL-7 to be removed o S.N. 016-0898: Existing Box Culvert under 131st Street at IL-7 o S.N. 016-3941: Proposed Box Culvert under East leg of 135th Street at IL-7 o S.N. 016-0933: Proposed Dual Box Culvert under 131st Street at IL-7 o S.N. 016-8351: Proposed Culvert under Driveway along IL-7 o S.N. 016-8352: Proposed Culvert under Driveway along IL-7 The anticipated construction completion date is October 31, 2024. The Consultant must complete and submit final measurements, calculations, and final contract records documents to the department no later than six (6) weeks after the completion of the project. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The firm acting as the prime must be prequalified in all the prequalification categories requested in the project advertisement even if they plan to subcontract part of the project, except where noted in a specific project advertisement. Any work being done by a consultant, prime or sub must be prequalified in the IDOT prequalification category of work they are performing. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 008 - RFQ - IL 7 from 131st St to 135th St, Phase III Project

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents