Similar Projects
Roadway Project on East Main Street
Infrastructure
Design
$400,000 CJ est. value
Leadington, MO 63601

Roadway Project on East Main Street
Infrastructure
Design
$400,000 CJ est. value
Leadington, MO 63601

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Workforce Innovation and Education Center - Site Development Package
Infrastructure
Post-Bid
Park Hills, MO 63601

Resurface
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Intersection Improvement
Infrastructure
Results
$75,000 to $100,000 est. value
MO

Mineral Area Apartments
New Construction, Infrastructure
Pending Verification
$15,842,400 CJ est. value
Farmington, MO 63640

2022 Asphalt Street Improvements
Infrastructure
Post-Bid
Farmington, MO

Job Order Contract for Concrete Pavement Repair
Infrastructure
Results
$250,000 to $500,000 est. value

2022 Excavation and Hauling
Infrastructure
Post-Bid
Farmington, MO

Asphalt Pavement Repairs at Various Locations on I-55, I-57, and I-155 in the SE District
Infrastructure
Results
$100,000 to $250,000 est. value

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Intersection Improvement at Various Locations in the SE District
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Job Order Contract for Concrete Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

2022 Road Overlay Projects
Term Contract
Results
$1,400,000 est. value
Farmington, MO

Last Updated 03/20/2023 08:06 PM
Project Title

2023 Asphalt Street Improvements

Physical Address View project details and contacts
City, State (County) Farmington, MO 63640   (Saint Francois County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $771,650 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Farmington is accepting bids for "2023 Asphalt Street Improvements". The project shall be defined as providing supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to provide asphalt placing and compacting work in accordance with the conditions and Specifications as directed by the City. These specifications require the furnishing of supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to provide asphalt placing and compacting work as directed by representatives of the City of Farmington. For Bid Bond and Performance Bond purposes, assume this contract will have an estimated value of $175,000.00.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents