Similar Projects
Calas Park And Foisia Park Roof Repair - PW1416
Renovation, Alteration
Conception
$492,495 est. value
Carson, CA

Contractor - FY22 Angeles National Forest Roofing Project
Alteration
Design
$700,000 est. value
San Fernando, CA 91342

Operations and Storage Facilities Phase III Construction of New Roof Structure over Existing Fish Tanks Platform
Renovation
Sub-Bidding
$268,380 CJ est. value
Culver City, CA 90230

Roof Encapsulation of Buildings at the Joint Water Pollution Control Plant
Alteration
Post-Bid
Carson, CA

Portable Buildings Roofing Project
Alteration
Post-Bid
Torrance, CA 90504

Repair Building Roof
Alteration
Results
$2,300,000 est. value
CA

Regional Specialty Roofing Job Order Contract
Alteration
Results
$500,000 est. value
Long Beach, CA

Roof Replacement, Art Center, Building 1A
Term Contract
Post-Bid
$490,000 est. value
CA

Orchard Dale Elementary School Modernization Project- Roofing/Sheet Metal
Alteration
Results
Whittier, CA 90603

Reservoir No. 7 Roof Replacement
Alteration
Post-Bid
$600,000 est. value
La Canada Flintridge, CA 91011

Roof Repair and Replacement Services
Alteration
Results
CA

Tower Roof Repair/Maintenance
Alteration
Post-Bid
Long Beach, CA 90815

Roof Repair and Replacement Services
Infrastructure
Results
$500,000 est. value
Los Angeles, CA 90040

Roof Replacement, Restore, Repair at Greenwood Elementary School
Alteration
Post-Bid
$600,000 est. value
Montebello, CA 90640

Corporate Yard Roof Replacement
Alteration
Results
$200,000 est. value
Cerritos, CA 90703

Last Updated 11/29/2022 06:05 AM
Project Title

RFQ Contractor - Athletics Modular Roof Replacement

Physical Address View project details and contacts
City, State (County) Walnut, CA 91789   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $185,000 [brand] Estimate
Plans Available from State Agency - 10/19/22
Owner View project details and contacts
Architect View project details and contacts
Description

Question Deadline 11/09/2022 at 2:00 PM PT Pre-bid RFI s are due electronically. Mt. San Antonio College of Los Angeles County, California, acting through its Governing Board of Trustees, hereinafter referred to as District, shall receive sealed bids for the award of a contract for the Athletics Modular Roof Replacement. Bids shall be valid for minimum of ninety (90) days after the Bid Deadline. Bids must be accompanied by cash, a certified or cashiers check, or a bid bond in favor of the Owner in an amount not less than ten percent (10%) of the submitted total bid price. The successful bidder will be required to furnish a performance bond and a payment bond, each in the amount of one hundred percent (100%) of the total bid price in the manner described in the Owner Documents. Bidders shall comply with California Public Contract Code Section 4108 with respect to subcontractor bond requirements. NOTE: Material lead times are six to nine months. Project is schedule to be completed during the summer break of 2023. DIR Registration. Each Bidder submitting a proposal to complete the work, labor, materials, and/or services ( Work ) subject to this procurement must be registered with the Department of Industrial Relations pursuant to Labor Code 1725.5. A Bidder who is not a DIR Registered Contractor when submitting a proposal for the Work is deemed not qualified and the proposal of such a Bidder will be rejected for non-responsiveness. Pursuant to Labor Code 1725.5, all Subcontractors identified in a Bidder s Subcontractors List shall also be DIR Registered Contractors. This project requires that the Contractor and any subcontractor(s) shall pay not less than the prevailing rates of wages to all workers employed by them in the execution of the contract. Copies of schedules of rates so determined are on file in the Purchasing Office and are available to any interested party upon request. Pursuant to Labor Code 1771.4(a)(4), Prevailing Wage Rate monitoring and enforcement shall be by the Department of Industrial Relations. In accordance with provisions of Public Contract Code Section 223000, substitution of eligible and equivalent securities for any monies withheld to ensure performance under this contract will be permitted at the request and expense of the Contractor. The District reserves the right: (1) to accept or reject any and all bids, (2) to waive any irregularities in the bids or bidding, (3) to be sole judge as to the merit, quality, and acceptability of materials proposed and their compliance to the specifications which in their opinion will best serve the interest of the District. Re-Roof Athletics building 44, by mechanically fastening Single Ply Thermoplastic (PVC) Roofing Membrane (Sarnafil) with flashings and other system components to comprise a roofing system. A Sarnafil roof is the District standard. Contractor MUST be certified to install Sarnafil roofing. NOTE: Material lead times are six to nine months. Project is schedule to be completed during the summer break of 2023.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents